Construction Business News, December 2016
Page 1
OCTOBER 2016
THE DEFINITIVE GUIDE TO THE REGION'S CONSTRUCTION PROFESSIONALS
The extension of Dubai's historic
waterway marks the realisation of
a long-held dream
THE DEFINITIVE GUIDE TO THE REGION'S CONSTRUCTION PROFESSIONALS
DECEMBER 2016
We design.. we construct.. we build..
Kingdom of Saudi Arabia,
PO Box 65697 Riyadh 11566
Tel: +966 11 293 1193
Fax: +966 11 293 1170
www.albawani.net
Classified Class 1 ISO 9001
Page 2
Page 3
construction business news me December 2016
3
Editor’s note
News
Appointments
Contracts
IN PERSON
Rizwan Sajan, founder
and chairman of Danube
Properties
Cover Feature
Building Dubai Water
Canal
Construction Machinery
The Case roadshow rolls
into Dubai
10
12
20
22
24
28
32
28
36
20
contents
Page 4
Page 5
Page 6
GETTING CLOSER TO THE TOP...
Getting closer to the top of the tallest mountain in the UAE will soon be a lot easier, thanks to the fleet of
Volvo construction equipment used in the building of the road to the Jebel Jais mountain. When it’s finished,
the route will run from Ras Al-Khaimah right to the 1,910 metre summit. The road has already become a
popular destination for motoring enthusiasts, who like to show off what their machines can do. But when the
road runs out, that’s where the Volvo operators show off their machines. And it’s impressive to see what they
can do. If you want to get closer to the action, scan the code and watch the video.
Building Tomorrow.
VIDEO
http://goo.gl/FPsU43
Page 7
Page 8
construction business news me December 2016
8
S U B S C R I B E
subscriptions@bncpublishing.net
CEO
Wissam Younane
wissam@bncpublishing.net
Managing Director
Walid Zok
walid@bncpublishing.net
Director
Rabih Najm
rabih@bncpublishing.net
Group Publishing Director
Diarmuid O'Malley
dom@bncpublishing.net
Group Sales Director
Joaquim D'Costa
jo@bncpublishing.net
+971 50 440 2706
Business Development Director
Rabih Naderi
rabih.naderi@bncpublishing.net
+966 50 328 9818
Editor
Jason O'Connell
jason@bncpublishing.net
Art Director
Aaron Sutton
aaron@bncpublishing.net
Sales Manager
Vishvanath Shetty
vish@bncpublishing.net
+971 52 6745378
Marketing Executive
Mark Anthony Monzon
mark@bncpublishing.net
PO Box 502511 Dubai, United Arab Emirates
P +971 4 4200 506 | F +971 4 4200 196
For all commercial enquiries related to
Construction Business News ME contact
sales@bncpublishing.net T +971 55 339 5097
All rights reserved © 2015.
Opinions expressed are solely those of the contributors.
Construction Business News ME and all subsidiary
publications in the MENA region are officially licensed
exclusively to BNC Publishing in the MENA region by
Construction Business News ME.
No part of this magazine may be reproduced or
transmitted in any form or by any means without
written permission of the publisher.
Images used in Construction Business News ME
are credited when necessary. Attributed use of
copyrighted images with permission. All images not
credited courtesy Shutterstock.
Printed by International Printing Press www.ippuae.com
Commercial Vehicles
Big 5 2016 Review
Legal Viewpoint
Defective works: who is
liable for what?
Supplier News
Event Preview
Save the Date
Editor’s Pick
36
40
44
48
54
56
58
24
40
44
Page 9
Page 10
construction business news me December 2016
10
Full Circle
Not a year goes by without Dubai complet-
ing construction work on yet another ambi-
tious project and 2016 has been no excep-
tion. Dubai Parks and Resorts opened in
October, marking the start of a new phase of
the city’s evolution into a global tourist hub.
But without doubt the standout project of
the year has to be the Dubai Water Canal –
a project that comes with extra significance
given the role the Creek has played in the
history of Dubai’s development.
It was here that the Bani Yas tribe set-
tled in the 19th century, establishing the
Al Maktoum dynasty in the city. The Creek
became its beating heart and a centre of
regional trade, becoming famous for the
abundant pearls found in local waters.
For years, it formed a natural harbour for
dhows arriving laden with goods from
around the Arabian Gulf and beyond. And
as Dubai grew as a regional trade hub, the
late Sheikh Rashid, one of the architects
of the UAE, ordered the dredging of the
Creek to accommodate larger vessels.
Eventually the city’s expansion neces-
sitated construction of much larger facili-
ties. First, Port Rashid – just south of the
mouth of the Creek – opened in 1972 fol-
lowed by Jebel Ali – at the other end of
the emirate – in 1985. Despite the loss of
its status and the gravitation of Dubai’s de-
velopment further southwards, the Creek
still teems with life and the hum of dhows
constantly coming and going.
With the opening of the second stage of
the canal, visitors will be able to travel by
boat in a full circle around central Dubai
which is now a huge man-made island.
Such a project would be unthinkable al-
most anywhere else. And in all likelihood
it will breathe new life into the areas
alongside it, providing plentiful oppor-
tunities for the construction industry for
many years to come.
editor’s note
Jason o'Connell
Editor
Page 11
Porto Arabia Towers
Doha, Qatar
©2014 Hill International, Inc.
Hill International
The Global Leader in Managing Construction Risk
www.hillintl.com
For nearly four decades, owners and developers in the Middle East have
turned to Hill International to manage their construction projects and
programs throughout the region. Hill is proud to have helped our clients
turn their most challenging visions into realities. We have participated
in over 10,000 projects with a total construction value in excess of $500
billion, managing all phases of the construction process from concept
through completion.
Hill is also the leading construction claims firm in the world, having helped
resolve problems on some of the most complex projects throughout the
Middle East and around the world. To minimize risk and maximize results
on your next project, turn to Hill International
Dubai Office: 971 4 227 0078
Doha Office: 974 4 435 8381
Corporate HQ: 800 283 4088
If you can imagine it, we can manage it.
Qatar National Museum
Doha, Qatar
Mall of Qatar
Doha, Qatar
Viva Bahriya Towers
Doha, Qatar
Page 12
construction business news me December 2016
12
For News, features and more, Visit www.CBNme.com
Follow us on twitter for breaking news: @cbn_ME
Follow us on Facebook for up-to-the-minute breaking news
Read the latest edition on www.CBNme.com
NEWS
P
roperty developer Meraas has an-
nounced plans to build a new
state-of-the-art multi-purpose are-
na with a capacity of 20,000.
Spanning an area of half a million
square feet, the Dubai Arena is set to
enhance the city’s leisure and enter-
tainment offering and become the ‘go
to’ venue for large scale international
music concerts, sporting events such as
hockey and NBA as well as other enter-
tainment events.
Dubai Arena will be the only all-pur-
pose indoor air conditioned arena of its
size in the entire region and will boast
an advanced infrastructure allowing it
to accommodate mega-events.
Strategically located at City Walk
with close proximity to Dubai Inter-
national Airport and accessible via
the Dubai Metro, the new venue will
be at the heart of Dubai’s latest urban
lifestyle destination surrounded by a
Meraas unveils Dubai Arena
Dubai Arena
pany, AEG Ogden, part of Anschutz
Entertainment Group that owns, con-
trols or is affiliated with world class
venues such as The O2 in London and
the Staples Centre in Los Angeles. The
project management contract for the
destination was awarded to DXB En-
tertainment PJSC who are responsible
for delivering Dubai Parks and Resorts.
Raed Kajoor Al Nuaimi, CEO of
DXB Entertainments PJSC said: “What
makes Dubai Arena stand apart from
its counterparts is its remarkable size,
capacity, and ability to be transformed
from a theatre to a stadium depending
on the scale of the event.
“Our appointment to project manage a
project of this scale is proof of the success
we have achieved in delivering Dubai
Parks and Resorts which commenced its
opening on 31st October. We are excited
to work closely with Meraas to deliver
yet another first to the industry.”
The 20,000 seat venue to be region’s top destination for global events and live shows
plethora of hospitality, F&B, enter-
tainment and shopping options.
Ground has been broken for the proj-
ect and is expected to be completed in
the last quarter of 2018.
His Excellency Abdulla Al Habbai,
Group Chairman, Meraas, said: “The
new destination will enrich Dubai’s ex-
isting infrastructure and will add a new
state-of-the-art venue that will accom-
modate international events and will
raise Dubai’s credentials as a premium
leisure and entertainment hub.
“Dubai Arena will host famous and
world renowned athletes, artists and
performers and attract tourists to Dubai
all year round. It will also host large
global events and performances that
have not visited the region as yet, due
to the lack of a suitable platform for
holding similar events.”
Managing Dubai Arena will be in-
ternational venue management com-
Page 13
construction business news me December 2016
13
DAMAC Properties has awarded China State Con-
struction Engineering Corporation (Middle East) with
a AED 554mn ($150mn) contract to build the Para-
mount Residences at the Paramount Tower Hotel and
Residences on Sheikh Zayed Road, Dubai.
China State Construction Engineering Corporation
(Middle East) will build the 27 floors that comprise
the residential portion of the 64-storey building.
The project is scheduled for completion in Q1 2020,
DAMAC said in a statement.
Speaking at the signing ceremony, Mohammed
Tahaineh, SVP – Commercial at DAMAC Properties
commented: “It is one of the four landmark hospitality
projects we are developing in collaboration with Para-
mount Hotels & Resorts, featuring Hollywood-themed
hotel rooms, hotel apartments and residential units in
Dubai and Riyadh. It gives us great pleasure to appoint
China Contracting for the provision of contracting ser-
vices and the delivery of this much-awaited property.”
Yu Tao, President & CEO of China State Construc-
tion Engineering Corporation (Middle East) LLC added:
“This represents a significant contract for us in one of
the most prestigious hospitality and residential projects
in the Middle East. We were appointed this year for the
infrastructure works at AKOYA Oxygen and this new
contract only cements further our strong relationship
with the real estate developer.”
The residences at Paramount Tower Hotel & Resi-
dences feature hospitality units with separate living
and dining areas, as well as two and three-bedroom
arrangements in addition to exclusive penthouses.
LACASA Architects and Engineering Consultants is
the main architect.
CSCEC wins
$150mn contract
with DAMAC
Properties
The government of Dubai has
hired HSBC to arrange initial
funding of $3bn towards the
expansion of Al Maktoum Inter-
national Airport.
Three state entities – the
Department of Finance (DoF),
state-owned fund Investment
Corporation of Dubai (ICD), and
the Dubai Aviation City Corpo-
ration (DACC) – will work jointly
to raise financing from various
liquidity sources, both conven-
tional and Islamic with HSBC
acting as Financial Advisor, ac-
cording to a statement on UAE
state news agency WAM.
Dubai’s
two
international
airports are set for expansion
that will enable them to serve
up to 146 million passengers
by 2025, due in large part to
a proposed initial $3bn financ-
ing transaction announced on
Tuesday by the government of
Dubai.
Already the world’s largest in-
ternational airport, Dubai Inter-
national Airport (DXB) handled
78 million passengers in 2015.
The new Al Maktoum Interna-
tional Airport (DWC) is planned
to become the primary airport
for Dubai, as well as the home
to Emirates Airline from 2025.
“Dubai remains firmly com-
mitted to the development of
the Al Maktoum International
Airport and to the growth of the
global aviation sector, and this
initial $3bn transaction to sup-
port Dubai’s ambitious 2025
passenger capacity targets is
testament to our belief,” said
chairman of Dubai’s Supreme
Fiscal Committee HH Sheikh
Ahmed bin Saeed Al Maktoum.
Dubai Airports recently an-
nounced plans to boost the
capacity of DXB from 90 to 118
million passengers by 2023
without building any major new
infrastructure. Under a pro-
gramme called DXB Plus, the
airport will add ten new A380
contact stands at Concourse
C to support Emirates’ grow-
ing fleet of superjumbos and
will also enhance services with
smart technology.
HSBC to advise on $3bn
Al Maktoum Airport
financing
Page 14
construction business news me December 2016
14
NEWS
Emirati sustainability consultancy AESG
has opened a new London office with
a view to expanding its reach beyond its
home base in the Middle East.
This move follows years of double digit
growth for the company in the Middle
East during which it has successfully
delivered numerous projects for interna-
tional clients, including many from the
United Kingdom.
Commenting on the decision to grow
AESG’s footprint outside the GCC region,
company Director, Saeed Al Abbar said:
“Based on our leading position in the
Middle East market, clients have increas-
ingly requested for our services outside
of the region. Opening an office in Lon-
don was a natural step as many of our in-
ternational clients operate in that market
which is a hub for international activity
in real estate development and design
excellence. This aligns with our expan-
sion strategy of focusing on markets that
value high quality consultancy services.”
AESG will initially focus on delivering
its specialist consultancy services to cli-
ents through the new office which will
serve as a hub for European and Interna-
tional markets. The company has estab-
lished a strong track record of working
effectively with international architecture
and development firms on iconic proj-
ects within the Middle East. These in-
clude The Opus in Business Bay, Dubai
and the Bee’ah Headquarters in Sharjah,
both of which were designed by award-
winning architect, the late Zaha Hadid.
AESG also worked on the ICD Brook-
field Place and the Dubai Design District
designed by Foster + Partners as well as
the UAE Pavilion at Expo 2020 which
was designed by Santiago Calatrava.
“We have extensive experience work-
ing with leading architectural practices in
Europe and opening our offices in Lon-
don will enable us to build on this,” said
Al Abbar.
“By going global, we will be able to
replicate best practices that we develop
from our operations in the internation-
al markets, in our Middle East practice
and vice versa which will only serve to
further enhance the quality and value
of our offerings.”
AESG goes global with
new London office
Dubai Wharf
more than
70 percent
complete
Construction at the AED 800mn
($218mn) Dubai Wharf develop-
ment in Culture Village is 70 percent
complete.
Overlooking a canal promenade
adjacent to Dubai Creek, the first
tower will be completed this month,
developer Dubai Properties said.
Two other towers in the residen-
tial development are scheduled for
completion in Q1 2017, while the
fourth tower and the development’s
retail space will be completed by
the end of next year.
Following the success of the re-
lease of the second phase develop-
ment, additional studios and apart-
ments within the development are
now available for sale at the DP
sales and customer services centre
in Ras Al Khor.
Located close to Al Jaddaf Metro
station, Dubai Wharf has a total of
594 studio-, one-, two-, and three
bedroom apartments. The develop-
ment will have 110 retail, F&B and
entertainment outlets on the ground
floor that overlook the canal at Cul-
ture Village.
Page 15
construction business news me December 2016
15
Dubai Electricity and Water Authority (DEWA) has started con-
struction of a new headquarters that will be the tallest, largest,
and smartest net Zero Energy Building (ZEB) in the world.
Located in Culture Village in Al Jadaf, the Al-Sheraa (Arabic
for sail) building will have a total built-up area of over 1.5
million square feet on a plot of 200,000 sq ft. The building
is designed to accommodate 5,000 employees, in addition to
customers and visitors.
Over 16.5 km2 of photovoltaic solar panels will produce
over 3,500 kilowatt hours (kW/h) and there will be about 10
km2 of Building Integrated Photovoltaic (BIPV), producing
over 1,100 kWh. Total renewable energy generated by the
building will be over 7,000 megawatt hours (MW/h) annually.
Al-Sheraa’s design was inspired by the UAE’s traditional houses,
where enclosed spaces overlook an open courtyard. The court-
yard will be the focal point and most prominent feature of the
building. To reduce heat in the open courtyard, a sail design is
used to provide shaded areas.
The building will use the latest technologies including In-
ternet of Things (IoT), Big Data and Open Data, and Artifi-
cial Intelligence (AI). Robots will be used for cleaning and to
provide security services. Al-Sheraa is planned to be a Zero
Energy Building (ZEB), where the total energy used in the
building during a year is equal to or less than the energy pro-
duced on site during that year.
DEWA is targeting a platinum rating by LEED (Leadership
in Energy and Environmental Design), the highest possible
certification.The building will use 50 percent less water than
regular buildings and green spaces will be almost 50 percent
of the buildings area.
The building, which will be directly linked to Dubai Metro
by a 150-metre covered bridge, will be completed and inau-
gurated in 2019.
Klampfer Middle East and Brayan Group have
joined forces to service the UAE mechanical, elec-
trical and plumbing (MEP) sector.
Klampfer-Brayan Electromechanical Contracting
LLC (KBEC) will combine the strength of Klampfer’s
international experience with Dubai-based Brayan
Group’s leading position in the local market.
“As a European company with an international
engineering portfolio, Klampfer is moving toward
increasing and diversifying our Middle East market
share beginning with the United Arab Emirates,”
said Klampfer Middle East Managing Director, Gün-
ther Hinterberger.
“Our partnership with Brayan Group serves to
both solidify our local footprint, and leverages the
company’s on-the-ground years of MEP experi-
ence.”
Praveen B Sarapure, chief executive officer,
Brayan Group, added: “The merging of our two
interests to create KBEC also brings considerable
financial support to MEP execution in the UAE.
This allows for a focus on strengths – not just of
our respective solid reputations and different lev-
els of geographic penetration – but on recruiting
top level human capital to service KBEC clients for
work needs.”
Eng. Joe Szabo, an industry veteran with 15 years
senior-level appointments across MEP and various
other construction sector disciplines, has been re-
cruited to head the new operation.
Klampfer Middle East is a KBW Investments
(KBW) portfolio company founded jointly with Bas-
ma Group and Klampfer GmbH of Austria.
DEWA begins
construction of new
smart building
Klampfer and Brayan
Group launch new
MEP outfit
Page 16
construction business news me December 2016
16
NEWS
Advanced Construction Technology Ser-
vices (ACTS) has opened a new branch
in Lebanon, taking its presence in the
country to three main laboratories and
five engineering offices.
The firm, which specialises in the field
of construction materials and geotechni-
cal engineering, said the new facility in
Al-Qalamoun, Tripoli features a state-of-
the-art laboratory fully equipped to per-
form various field sampling and materi-
als testing procedures, covering asphalt,
concrete, soil and various other construc-
tion materials.
Engr. Khaled Awad, Chairman of ACTS,
said: “The opening of the Tripoli branch
coincides with the 20th year anniversary
of ACTS. This speaks volumes about our
ACTS opens a new branch in Lebanon
Dubai Land Department launches Gulf Real Estate Awards
Dubai Land Department (DLD) has
launched the first Gulf Real Estate
Awards to recognise excellence in the
real estate sector.
HE Sultan Butti Bin Mejren, Director
General of the Land Department, said
the awards came from the directives
of His Highness Sheikh Mohammed
bin Rashid Al Maktoum, UAE Vice
President, Prime Minister and Ruler
of Dubai, towards more innovation.
The event aims to promote and en-
courage best practices among devel-
opers and brokers, facilities manage-
ment, engineering and legal services,
contractors and consultants.
“These awards have been launched
following a considerable amount
of effort and planning in line with
our vision to be the first real estate
destination globally in innovation,
trust and happiness.” Bin Mejren
said at a press conference to launch
the awards.
“These awards are an expression
of our commitment to stimulating
innovation in the real estate sector,
by inspiring creativity and excep-
tional practices that lead to sustain-
able growth in the Gulf region. These
awards are an incentive for compa-
nies operating in the real estate sec-
tor to compete with each other and
improve their services and projects.”
The Dubai Real Estate Institute, the
educational arm of Dubai Land De-
partment, signed an agreement with
Awards International on the sidelines
of the recent Cityscape Global 2016 ex-
hibition, which paved the way for these
awards open to all businesses that op-
erate in the Gulf real estate sector.
Dubai Land Department will be
in charge of all matters relating to
the organisation of the awards. The
deadline for early applications is 15th
December 2016, while 19th January,
2017 will be the final day for the sub-
mission of applications. The awards
committee will announce the candi-
date shortlist for the finale on 26th
January, 2017, with the awards cer-
emony to be held on 19th April 2017.
All businesses and companies op-
erating in the real estate sector, be
they private or public, are eligible to
participate. The awards encompass a
total of 21 categories, including those
for major private and government or-
ganizations, entrepreneurs and small
businesses. The awards will provide
the opportunity for all types of busi-
nesses to share their success stories.
Businesses or parties wishing to
participate in the awards ceremony
are requested to select the category
in which they wish to compete. To do
so entries can be made by completing
all of the prerequisite information on
the website, whether on behalf of the
company or the person applying and
make a payment.
Engr. Khaled Awad
commitment to the Lebanese Construc-
tion market.
“It also reflects our belief that North
Lebanon will witness soon a substantial
rise in construction activities. ACTS will
ensure it brings its twenty years and re-
gional experience in quality control and
unique know-how in testing to Lebanon
second capital and the whole north.”
Since its establishment in 1996, ACTS
has been going from strength to strength,
becoming the preferred third-party pro-
vider in the region for geotechnical engi-
neering, materials testing and consulting.
The company has been awarded con-
tracts to work on some of the most ambi-
tious projects in the region, including the
Riyadh Metro, King Abdulaziz Interna-
tional Airport, Doha Metro and Kingdom
Tower, the world’s first kilometer-high
skyscraper being constructed in Jeddah,
Saudi Arabia.
Page 17
The Formwork Experts.
Real-time measuring of
concrete strength
Concremote® – Redefine your program. Push progress.
Easy to handle
Measuring sensors are quick to install and position
as they are simply placed on fresh concrete.
State-of-the-art measurement
Concremote® stands out for its field-proven process
reliability and for being very user-friendly.
Process optimisation
Cut down labour and equipment costs by reducing
striking time to a maximum of 2-3 days.
Technology | Bridges | Tunnel | Highrise | Residential | Energy
www.doka-me.com
More Information:
www.doka.com/concremote
EXCLUSIVE
BY DOKA
Page 18
construction business news me December 2016
18
NEWS
Al Habtoor Motors led a delegation of
Saudi Arabia’s largest fleet operators on
a site visit to the FUSO truck factory in
Chennai in October.
The event was an opportunity to meet
and share ideas with other industry col-
leagues while customers got to see the
outstanding build quality of FUSO trucks
in this brand new manufacturing facility
and test drive the full range of vehicles.
Erich Nesselhauf, Managing Direc-
tor and CEO, Daimler India Commer-
cial Vehicles, said: “We are delighted to
welcome these high profile FUSO cus-
tomers at our facilities. Our world-class
Saudi fleet operators visit FUSO factory
New event highlights RAK investment opportunities
Next month will see the
launch of a new event
aimed at attracting invest-
ment in the fast growing
emirate of Ras Al Khaimah.
Taking place from 13-14
December 2016, the Ras
Al Khaimah Finance & In-
vestment Forum (RAKFIF)
is a platform designed to
showcase
opportunities
across key industries in-
cluding hospitality and
tourism,
infrastructure
and real estate.
The event has strong
government backing and
has the patronage of His
Highness Sheikh Saud bin
Saqr Al Qasimi, Supreme
Council Member and Rul-
er of Ras Al Khaimah.
RAKFIF will bring to-
gether experts from gov-
ernment and industry with
international and regional
investors and financiers.
The agenda includes panel
discussions, sector specific
breakout sessions and ple-
nary sessions and already
has a confirmed line up of
speakers representing key
economic sectors.
Over 300 C level and in-
dustry leaders will be in
attendance at the event
which is backed by BNC
Publishing as its exclusive
Trade Media partner.
Government
entities
lending their support in-
clude Ras Al Khaimah De-
partment of Civil Aviation,
RAK International Airport,
RAK Ports, Al Marjan Is-
land Company, RAK Tour-
ism Development Authori-
ty, RAK Free Trade zone &
RAK Investment Authority.
Goldman Sachs Inter-
national, HSBC, Samena
Capital Investments, Col-
liers International, UTI-
CO, Nabarro LLP, Hilton
Worldwide,
ADPI
and
Hutchison Ports are just
some of the heavyweight
private partners that will
be involved.
manufacturing plant and the high qual-
ity level of our operations are the foun-
dation of our success.
“Since 2013, more than 5,000 FUSO
trucks have rolled off our lines for ex-
port to almost 30 markets in Asia, the
Middle East, Africa, and Latin America.”
Al Habtoor Motors Saudi Arabia Coun-
try Head, Simon Monahan said: “We ap-
preciate our customers’ taking time out
from their busy schedules to visit this
state of the art FUSO factory. At Al Hab-
toor Motors Saudi Arabia, we are com-
mitted to meeting the needs of truck
operators and reducing their fleet costs.
We are pleased to support our custom-
ers by offering the best customer care in
the market.
He added: “We are proud of our brand
new facilities and Head Office in Ri-
yadh. The state of the art National Parts
Distribution and Heavy duty truck facil-
ity at Eastern Ring Road, Exit 17 is fully
operational and Dammam and Jeddah
facilities will open very soon. These, to-
gether with our mobile servicing vehicles
to service trucks at customer premises,
demonstrates our commitment to keep-
ing vehicle downtime to a minimum and
saving truck operators money.”
Page 19
FIRE RESISTANT FACADES
Countless
Possibilities
GLASS & METAL CLADDINGS
GRC, GRG & GRP
MARESTONE
ALUBOND SOLID SURFACE
www.globeclad.com
sales@globeclad.com
Sharjah
Mulk Holdings F.Z.C
Phase 1, Hamriyah Freezone,
Sharjah, U.A.E
Tel : +971 6 526 2202
Fax : +971 6 526 2203
Dubai
GLOBECLAD
Office 706, Palace Towers
Dubai Silicon Oasis, Dubai, UAE
Tel: +971 4 379 3444
Fax: +971 4 379 3434
Page 20
construction business news me December 2016
20
Appointments
Global developer Emaar Properties has
appointed Veresh Sita, an international
technology professional with deep ex-
pertise in developing customer-oriented
solutions and experiences, as its Chief
Digital Officer (CDO).
Veresh joins Emaar from Alaska Airlines,
where he was responsible for overseeing
an organisation of 300 IT professionals and
Dubai-based
developer
Shaikhani
Group has named Alan James Gam-
mon as its new Chief Operating Offi-
cer (COO) as it aims to complete AED
3.5bn ($950mn) worth of projects in
the UAE.
Gammon will oversee activities in-
cluding asset management, new busi-
ness, joint-venture partnerships and
day-to-day operations of the real es-
tate business.
Mahmood Abu Baker Shaikhani,
Managing
Director
of
Shaikhani
Group, said: “The appointment of Mr.
Gammon will help Shaikhani Group
to pursue its expansion initiatives and
realise its vision for 2025. His undis-
puted expertise in the real estate sec-
tor will help us firmly maintain our
position as one of Dubai’s leading real
estate institutions.”
Gammon previously served as the Di-
rector of Business Development for the
Funsho Management Consulting group
Emaar Properties goes digital
Shaikhani Group appoints new COO
investing in the airline’s infrastructure, en-
terprise systems and technical innovation.
He also has strong expertise in the real
estate sector having worked as the CIO
and CDO for Seattle-based Colliers Inter-
national, helping transform its informa-
tion and technology services department.
Bringing nearly 25 years of experi-
ence in information technology, Veresh
is tasked with developing a new digital
strategy that will drive Emaar’s growth.
He will also prioritise Emaar’s technology
roadmap to assure seamless customer
service delivery and strengthen the com-
pany’s agility and responsiveness in a
fast-changing landscape.
Mohamed Alabbar, chairman of Emaar
Properties, said: “Emaar is moving into
the next era of growth centred on the
new digital ecosystem that is shaping
customer outlook and preferences. In
today’s fast-evolving world, organisations
that lead are the ones that can automate
at scale, are agile and highly responsive
to the needs of customers.
“With our strong international foot-
print and diversified business compe-
tencies, Emaar’s strategy to create long-
term value will be led by innovative,
tech-driven business and enterprise
systems. Veresh has proven global ex-
pertise in reengineering technology
platforms that will contribute tremen-
dously to the organisation’s growth.”
and advised on investment opportuni-
ties in the real estate and hospitality
business. Prior to that he held the post
of COO with Royal Groups Yosh Hos-
pitality managing all aspects of the hos-
pitality and property portfolio.
He has also worked in the capacity
of Vice President at DAMAC proper-
ties where he was responsible for the
customer journey from point of sale to
handover. And at the Majid Al Futtaim
group he oversaw mixed use develop-
ment service operations including The
Wave in Muscat.
Page 21
– Almoayyed Motors – Manama / venugopal.nair@almoayyed.com.bh
– Al Kasid Commercial Agencies Ltd - Erbil, Baghdad / ahmed.ali@al-kasid.ae
– The Commercial & Industrial Company - Amman / w.albajjali@cic.com.jo
– Mohsin Haider Darwish LLC - Muscat / bhaskar@mhd.co.om
– Almana Motors Company W.L.L – Doha / oghobrial.aa@almanagroup.com
– Al Jazirah Vehicles Agencies Co Ltd – Riyadh, Dammam, Jeddah / smomea@aljazirahford.com
– Al Tayer Motors – Dubai / razmy@altayer-motors.com
– Premier Motors – Abu Dhabi / homohamed@altayer-motors.com
Bahrain
Iraq
Jordan
Oman
Qatar
Saudi Arabia
United Arab Emirates
United Arab Emirates
Made for the job
Ford Trucks Construction Series has been designed for the toughest jobs out there, from mixing
cement or moving great mounds of earth, working in the vastest of quarries to the smallest sites.
Drop into one of our authorised dealerships today to find out more about how our tenacious and
efficient 350 PS Motor-powered Series can help you.
www.fordtrucks.com.tr
Ford Trucks
Sharing the load
Page 22
construction business news me December 2016
22
Contracts
AlMoayyed contracted for $150mn
Bahrain project
Drake & Scull
unit seals deals
worth $67mn
Macro wins FM
contract with
DMCC
MSF and Serka Taahhüt bag $270mn
Port of Duqm contract
Aldar awards AED 30mn early works contract
GFH Real Estate (GFHRE) has appointed
AlMoayyed Contracting as the Main Con-
tractor of its $50mn Harbour Row proj-
ect in Bahrain Financial Harbour. Under
the deal, all contracting works, including
foundations, construction, mechanical,
internal and external finishing works will
be assigned to AlMoayyed Contracting.
Located at the heart of the capital Mana-
ma, the project consists of 450 residential
units, in addition to retail outlets with a
waterfront view.
Drake & Scull International (DSI) sub-
sidiary Passavant Energy & Environ-
ment (PE&E) has secured three contracts
to build Wastewater Treatment Plants
(WWTP) in New Delhi and Bangalore in
India as well as Gaza in Palestine for a
combined value of AED 246mn ($67mn).
PE&E will undertake the engineering, pro-
curement and construction (EPC) work
and assume responsibility for the opera-
tions and maintenance of the plants.
Macro has won a three-year contract
with DMCC (Dubai Multi Commodi-
ties Centre) to maintain commercial
tower, One JLT. The Mace subsidiary
will provide full FM services in the
14 floor-tower, which is located at the
centre of Jumeirah Lake Towers (JLT)
in Dubai. Services include Mechani-
cal, Electrical and Plumbing (MEP), as
well as cleaning, pest control, waste
management and valet parking. Mac-
ro will also oversee specialist con-
tracts for CCTV, BMS, access control
and fire alarms.
Portugal’s MSF Engenharia and Turk-
ish contractor Serka Taahhüt have
clinched a major contract to work on
the Port of Duqm in Oman. Special
Economic Zone Authority (SEZAD)
awarded the 50/50 joint venture with
a EUR 252.8mn ($274mn) package
for construction of roads, infrastruc-
ture and buildings at the Commercial
Terminal and operational Zone Areas,
Port of Duqm. Work is expected to be
finished within 30 months.
Aldar Properties has awarded
the early works contract for
a luxury residential develop-
ment located on Yas Island to
Dutch Foundation & Concrete
Rehabilitation Company. The
AED 30mn ($8.16mn) contract
provides for shoring, piling and
earthworks for Mayan, which
comprises 512 luxury apart-
ments spread across five build-
ings. The Abu Dhabi-based
full-service engineering founda-
tion company will carry out the
work over a five month period
starting immediately.
Page 23
construction business news me December 2016
23
Habtoor Leighton Group awarded
$136mn Gate Avenue contract
FLSmidth signs
$200mn cement
plant contract
in Iraq
Mott
MacDonald to
oversee new
oil terminal
in Iraq
POSCO bags $900mn deal to build
hotel in KSA
Sarooj Construction appointed
for Mall of Oman
Habtoor Leighton Group (HLG) has
won the AED 500mn ($136mn) con-
tract to build Gate Avenue at DIFC.
The retail project is already worth
AED 450mn approximately with the
existing truck tunnel and master plan
infrastructure in place. Set for the first
phase of completion by the end of
2017, the 660,000 square feet devel-
opment will have over 200 dining,
boutique, retail and entertainment op-
tions, as well as a new mosque.
Majid Al Futtaim Properties has appointed Sarooj Construction to carry out early works
for its flagship Mall of Oman retail project in the Sultanate. The contractor is expected to
start soon on work that will include bulk excavations, retaining walls, utility diversions
followed by major road and bridge construction around interchange number 6 of the
Muscat Expressway. When it opens in 2020, Mall of Oman will be the largest integrated
retail, leisure and entertainment destination in the Sultanate.
FLSmidth has signed a contract worth
more than $200mn with Iraq Cement
Co., to supply a cement plant for
the Al Muthana region. The contract
is a full EPC order, comprising en-
gineering, all FLSmidth equipment
supplies, erection and construction,
as well as commissioning and train-
ing once completed. The plant will
produce 6,000 tonnes of cement per
day and will feature state-of-the-art
equipment.
Mott MacDonald has been appoint-
ed by Qaiwan Group to provide
engineering, procurement and con-
struction (EPC) management servic-
es for the new Xarajyan oil terminal
in Iraqi Kurdistan which is sched-
uled to be complete in Q2 2018. The
company will design the first phase
of the 140,800m3 storage terminal,
auxiliary utilities and infrastructure
facilities. The consultancy will also
provide interface and procurement
engineering services and will assist
with pre-fabrication, construction
and assembly engineering.
POSCO Engineering & Construction Co.
has won a $900mn project to build a 3,000
key hotel project near the city of Medinah,
KSA. The development in Madinah Hajj
City will serve pilgrims on their way to Ma-
dinah from Mecca. Under the agreement,
the JV will build a giant hotel complex that
will comprise five towers by February 2017.
Located 3 km from the center of Madinah,
Madinah Hajj City is being developed on
1.6 km2 of land and will have a construc-
tion cost of $16bn.
Page 24
construction business news me December 2016
24
Danube Properties has launched its seventh development just as
it puts the finishing touches to its first. Jason O’Connell spoke to
chairman and founder Rizwan Sajan about the company’s journey.
Making
Miraclz
In person
Page 25
construction business news me December 2016
25
R
izwan Sajan will probably reflect
on 2016 as being the year things
began to take off for Danube
Properties. The company’s founder and
chairman unveiled his seventh prop-
erty development in Dubai last month
just as contractors were putting the
finishing touches to the first project he
launched in June 2014.
Danube’s short journey as a devel-
oper has taken it from villas in the
burgeoning neighbourhood of Al Fur-
jan via low rise apartment buildings in
Studio City to its first high rise tower in
Arjaan next to Miracle Garden.
But it is this year that business has
really accelerated. The company started
2016 with a bang, launching Starz by
Danube followed by the Glamz resi-
dence, both of which sold out in record
time. So far this year it has sold over
1,000 units, awarded construction con-
tracts worth AED 501mn ($136mn) to
two contractors while signing three en-
abling contracts worth over AED 21mn.
Its latest project - the AED 400mn Mira-
clz by Danube - takes the aggregate
value of its portfolio to AED 2.2bn at
the turn of the year.
Sajan’s philosophy is to proceed
cautiously with his developments,
selling each one completely before
launching a new project to avoid over-
stretching himself. But such has been
the demand for his “affordable luxury”
offering that Danube usually sells out
within four to eight weeks, allowing
him to launch a new property every
two to three months.
His latest project, however, took a
little longer than expected. “It took us
almost five months to come out with
this new project – whereas normally
we try to launch a new project every
two or three months and people are
wondering why it took longer,” Sajan
says. “When we sold the last project
and started scouting for a new plot we
realised that prices has gone up. Peo-
ple say the market is down but we saw
prices had gone up and we were not
able to find the right priced plot, so it
took a little longer.”
When Danube announced its first
project in Al Furjan last year it paid in
the range of AED 120 per sq ft. Today,
Sajan says, a similar plot in the same
area is around AED 140/150 per sq ft
indicating that demand is on the up.
Perhaps that explains why he decided
to turn his attention to another emerg-
ing neighbourhood: Arjaan.
Sajan says Arjaan fits a similar profile
to the other areas it has targeted, be-
ing an up and coming neighbourhood
with essential infrastructure already in
place. The company has bounced back
with its tallest project to date. Miraclz is
a 36-storey tower with 591 apartments
ranging from studios to two bedrooms.
Though it is bigger in scope than its
previous developments, Sajan says the
formula remains very much the same.
“Charge the customer the price of Dis-
covery Gardens and give them the
quality of a Marina or Downtown apart-
ment,” he says.
Units in Miraclz will be of similar size
to its previous projects while custom-
ers will pay more or less the same at
approximately AED 1,000 per sq ft.
Studios start at AED 450,000 while two
bedroom apartments cost in the region
of AED 1.25mn. Being a bigger devel-
opment, Miraclz is equipped with a
broader offering of facilities and ame-
nities and residents can access a 1,250
sq ft health club at the podium level
while there will be eight retail units on
the ground floor.
As with previous developments,
apartments will be fully furnished with
furniture supplied and designed by
Danube Home. One of Danube’s big
advantages as a developer is that the
company is also one of the largest sup-
pliers of building materials in the UAE
as well as having its’ owns furnishings
division, allowing it to deliver projects
at lower cost than its competitors.
Construction advances
Aside from being taller, Miraclz also dif-
fers from previous Danube projects in
that the company began construction
before they started selling off plan. Atlas
Contracting will carry out earthworks as
it has done for all previous projects.
Dreamz
Glitz
Page 26
construction business news me December 2016
26
“Why change a winning formula?”
says Sajan. “Atlas has done well com-
pleting jobs on time and with dewater-
ing which is very important.” The com-
pany has also used the same interior
designer for all its projects. Danube
expects to award the main construction
contract for Miraclz in another two to
three months.
United
Engineering
Construction
(UNEC) was selected to build the 171
villas that make up Danube’s first de-
velopment – Dreamz in Al Furjan - and
broke ground on the project in Febru-
ary 2015. The AED 500mn project is
in the final stages of construction and
the first units should be handed over
around the turn of the year.
Danube then turned to Naresco Gen-
eral Contracting in August 2015 for
its second project - Glitz 1 and 2 – in
Studio City. The AED 300mn develop-
ment consists of two, 8 storey towers
with a combined total of 300 apartment
units ranging from studios to three bed-
rooms. Construction is complete and
the first units due to be delivered ahead
of schedule early next year.
Naresco followed up in April this
year with the AED 185mn ($50.36mn)
main contract for the adjacent Glitz 3
development which has 350 units. Dan-
ube says preparation for casting the
third floor is underway and construc-
tion is also three to four months ahead
of schedule.
Danube returned to Al Furjan to
launch its fourth project, Starz, in De-
cember 2015. The AED 300mn proj-
ect comprises 452 units from studios
to two bedroom apartments in two,
17 floor towers sharing a podium. En-
abling works are coming to completion
and another 20,000 m3 of earth needs
to be excavated while there is a sig-
nificant amount of dewatering taking
place. Bin Shafar Contracting was an-
nounced as the main contractor in No-
vember and will also reportedly build
the sixth project on an adjacent plot in
Al Furjan. Danube announced the AED
300mn, 418-unit Glamz project in May.
So what’s next for the emerging de-
veloper? “After this we’ll come out with
another project every three to four
months,” says Sajan. “We’re looking for
another plot in Arjaan to launch in Q1
2017, as soon as we sell Miraclz.”
Property prices in Dubai have gen-
erally stagnated over the past two
years, though the higher end of the
market has been hardest hit. The fact
that more and more people are look-
ing to stay in the city for the long term
and want to get on the property lad-
der rather than rent, appears to bode
well for the more affordable end of
the market and Danube is just one
of a number of developers that have
moved to exploit rising demand. But
can investors expect property prices to
rise again anytime soon? “They have
to,” says Sajan. “I’m just surprised they
haven’t already. Because plot prices
have gone up so eventually this will
reflect in property prices. We’re ap-
proaching Expo 2020 and I’m sure
there will be a surge in prices.”
Glamz
In person
Plot prices have gone
up so eventually this will
reflect in property prices
Page 27
March 7–11, 2017 | Las Vegas Convention Center | Las Vegas, USA
IF IT’S NEW,
IT’S HERE.
Get the special $149 rate (and save up to $100)
by registering early at www.conexpoconagg.com.
Register today to get the ultimate view of where construction is going.
IMAGINE WHAT’S NEXT.
Imagine less downtime. Imagine being more efficient. Imagine
seeing what’s next from over 2,500 exhibitors spread out over
232,000 square meters.
Imagination becomes reality in Las Vegas on March 7–11, 2017—
and if you make your reservation right now, you can ensure your
spot at this huge event... and save!
Co-located
with
®
Page 28
construction business news me December 2016
28
The extension of Dubai's historic waterway marks the
realisation of a long-held dream.
Jason O'Connell caught up with the contractor that built it
Cover story
Page 29
construction business news me December 2016
29
I
t’s been several decades in the
making but finally the long-held
ambition of extending the his-
toric Dubai Creek back to the
Arabian Sea has become a reality. The
achievement marked the realisation of
a dream of Sheikh Rashid bin Saeed
Al Maktoum – one of the principal ar-
chitects of the United Arab Emirates
(UAE) 45 years ago and the late fa-
ther of Sheikh Mohammed bin Rashid
Al Maktoum, current Prime Minister of
the UAE and Ruler of Dubai.
The first phase of the canal was
completed more than a decade ago at
a cost of AED 1bn and extended 9 km
from Ras Al Khor through Business Bay
to Sheikh Zayed Road (SZR). Like oth-
er big projects at the time, completing
the final 6km stretch of the canal was
put on the back burner while Dubai
staged a recovery from the global fi-
nancial crisis of 2008/9. But two years
ago the project finally got the green
light and in November the waterway
was inaugurated in a spectacular cere-
mony overseen by Sheikh Mohammed.
Belgian contractor BESIX – through
its local venture Belhasa Six Construct
– was entrusted with the bulk of the
works related to the new portion of
the canal, which has turned a large
part of central Dubai into an island.
Jean-Pol Bouharmont, deputy general
manager of Six Construct for the UAE,
Oman, Qatar and Bahrain, was heav-
ily involved in the process, especially
during the final month to ensure it was
delivered on time and to the specifi-
cations of the client – The Roads and
Transport Authority (RTA).
The contractor was awarded two
main packages of work. The first in-
volved diverting all the underground
utilities and carrying out canal excava-
tion wherever possible while it wait-
ed for another contractor to build the
bridges over the main canal crossings -
SZR, Al Wasl Road and Jumeirah Beach
Road. The second package involved
treating the water in Business Bay -
which had become hyper saline over
a 10-year period - before releasing it
safely back into the sea.
“The original creek extension was
stopped with a series of utilities not
diverted,” Bouharmont says. “In fact
there was not just one lagoon in Busi-
ness Bay but a series of them separated
by bunts where the existing services
were still in place. Due to a combina-
tion of evaporation, the tide and the
dewatering of all the new buildings
in the area (the dewatering was dis-
charged into the lagoons) the water
became highly saline over time. The
biggest lagoon was more or less white
as it was really hyper saline.”
Carrying out the water treatment
package was quite challenging in
terms of how to dilute the water to an
acceptable mix before opening the ca-
nal, especially on the creek side. Six
Construct pumped the hyper saline
water all the way from the lagoon up
to a mixing basin near a newly created
Page 30
construction business news me December 2016
30
and trying to minimise disturbance to
the environment because it’s an area
where you have a lot of villas. You
have an extremely tight schedule but
at the same time you have to try not to
disturb too much during the night. But
the challenge was more to do with traf-
fic sequencing because of the bridges
and diverting existing utilities.”
The latter involved recreating new
networks for all the underground
services – sewer lines, electricity,
water pipes, telecoms, etc – that had
previously passed through the site
of the canal. The relocation of these
services was a laborious process that
took two years before excavation
Cover story
peninsula at Jumeirah where it was
blended with seawater to reduce the
salinity before being discharged into
the sea. The whole process took two
months with another month to pump
normal seawater back into the lagoon
using a pair of 800mm pipes laid on
the canal bed.
“This second package of work was
awarded quite late in January 2016,
where we had nine months to divert
the services in Business Bay area, re-
moving the bunts, pumping and mix-
ing the seawater and then pumping
seawater back into the lagoon,” says
Bouharmont. “Then step by step the
bridges were completed between
April, for the first one, and July for the
last one over SZR and we were able to
excavate below the bridges and finally
connect the canal to the sea.”
The final stage of excavation could
only take place once the bridges were
installed on top of the huge pillars
holding them in place. The distance
from the bridge to the bass of the
canal is around 12 metres and each
pillar goes a further four metres be-
low ground level. Around 50,000 m3
of earth was excavated from beneath
each bridge but at this point removing
the earth had become quite straight-
forward. Because the rest of the canal
was already excavated, construction
traffic could travel along the canal bed
to the artificial peninsula built using
the excavated earth.
“There was quite a lot of traffic
management during the two and a
half years but that last part was not
so difficult,” Bouharmont explains.
“More difficult was installing the block
work for the quay walls below those
bridges. We got those areas quite late
in the contract period and we had to
be ready to expedite the work. We
even coordinated with the client and
the other contractor, especially on SZR
bridge, to work on part of the quay
walls while they were doing the foun-
dation of the bridge. We didn’t wait
for the bridge to be completed before
building the wall.”
The quay walls were made using
precast concrete blocks weighing 40 to
50 tonnes each. Every night during the
construction period 30 to 50 blocks at
a time were made in a special facility
in Warsan, depending on the progress
of installation. There is a ten metre
wide promenade either side of the ca-
nal after which it’s safe to excavate to
build alongside the canal.
“You would have some shoring to
do but you can excavate without any
problem although there will be some
dewatering during construction,” he
says. “Basically you are building a huge
brick wall and then back filling behind
the quay walls with some rock. Tech-
nically it was not so challenging build-
ing quay walls. The challenges were
more involving traffic management
Page 31
construction business news me December 2016
31
could begin. Tunneling was used
where possible to minimise the im-
pact on traffic and excavations.
Six Construct has plenty of experi-
ence doing some of what it was tasked
with on this project while other ele-
ments were new. “It’s a unique project
for sure. But it’s a mix of things we
have done in different environments.
I’ve been here for 20 years and I’ve
always had at least two ongoing proj-
ects building quay walls with the same
technique. So that’s nothing special.
It’s more that it involved building in
a heavily congested environment. But
dealing with the hyper saline water is
unique and it was necessary to investi-
gate what would be the best solution.
We had part of the expertise in house
but for the pumping and mixing we
used a specialist contractor.”
Another major challenge only came
about very late in the process. Due to
design issues, Six Construct was given
the green light to proceed with a very
significant portion of the work – con-
struction of three pedestrian bridges
and the canal promenades – in the
last six months, leading to a logistical
headache to complete the job on time.
It was here that Bouharmont be-
came deeply involved. “Part of those
bridges were executed while the ca-
nal was already flooded so we had to
build temporary platforms over the
canal to be able to build the bridges.
There was a lot of sequencing into
those bridges which are also techni-
cally quite challenging. When you
see them now they are quite iconic.
We used specialist sub-contractors to
fabricate them but we had to help
erect them.”
With this job under its belt Belhasa
Six Construct says it is ready to take
on the next challenge for the RTA,
which has been a regular client for
the past 20 years. Among other proj-
ects, the contractor has delivered
Business Bay Bridge, Garhoud Bridge
and is building the bridge to Deira Is-
lands. It also completed work on the
Dubai Tram two years ago.
Olivier Crasson, executive vice presi-
dent, confirms Belhasa Six Construct is
tendering for infrastructure work in the
run up to Expo 2020. “The first pack-
ages for infra work are on the market
and some have been awarded so we
assume that the quantity of work re-
lated to Expo 2020 will increase, prob-
ably in 2017. But at the moment there
is still not too much on the market.”
Belhasa Six Construct is also experi-
enced in another fast growing sector of
the Dubai construction sector, having
recently completed work on Legoland,
part of Dubai Parks and Resorts. In fact
it also worked on Ferrari World in Abu
Dhabi and is carrying out an expansion
of the theme park. The company says
it is in discussion for more work in the
theme park arena.
Dubai Canal In
Numbers
• 3.2 km long
• 80m to 120m
wide
• 4m deep
• 3 road
bridges and
3 pedestrian
bridges
• 250,000m2 of
area reclaimed
on the sea
• 800m of new
beach along
reclaimed area
• 2.8 million m3
of excavation
• 9,400 concrete
blocks
• 27,000 m3 of
concrete for
diaphragm wall
Page 32
construction business news me December 2016
32
MACHINERY
A Dubai debut for Case’s Eagle Days event was a chance to see how its
machines and support are changing in the region
By Matthew Treanor
Spreading
its Wings
Page 33
construction business news me December 2016
33
T
here’s only so much you
can learn about your next
big machine purchase from
poring through brochures,
technical data sheets and websites.
With so much choice on the market,
it can be a daunting task to decide
which backhoe, excavator or wheel
loader will help you win a tender or
keep your workshop from turning
into pile of spare parts and metal.
Even in our digital world, there is ulti-
mately nothing better than getting up
close, climbing on-board and hearing
what a machine can do directly from
the people who built it.
With that in mind, manufacturers
and their dealers continue to host op-
erators, plant managers and contrac-
tors at open days. These are often
opportunities to see the machines in
action and get a clearer understand-
ing of how buying new machines can,
hopefully, give you an extra edge over
your competitors.
Unfortunately not all open days are
the same, however equipment maker
Case has continued to develop its own
experience for its existing and future
customers, as well as the sales teams
tasked with selling its ever-evolving
machine and equipment line-up.
Its impressive roadshow – CASE
Construction Equipment Eagle Days –
dropped into Dubai last month. The
event has been on a tour that has
included South Africa earlier in the
summer, where it invited representa-
tion from across Sub-Saharan Africa,
including 120 professionals from the
host country, Mozambique, Uganda,
Zambia, Namibia and Zimbabwe. A
previous event held last year in Tuni-
sia tackled the North Africa market.
Held between 20-22 November at
the welcoming Jebel Ali Golf Resort
and Shooting Club on the edge of the
city, it was the turn of over 160 cus-
tomers from across the Middle East
and East Africa, including a large num-
ber from the UAE, plus Oman, Qatar,
Palestine, Saudi Arabia, Iraq, Ethiopia
and Djibouti, to find out more about
its latest line-up.
Reviewing an event that completes
a tour of his working brief, Franco In-
vernizzi, senior business director, CNH
Industrial Construction Equipment for
Africa and Middle East, is ready to
look back on a successful programme
of showing what Case’s equipment of-
fers to the regions.
He says that once again the com-
pany has had a great response to an
EAGLE DAYS event, the first to be held
in the region.
“The Eagle Days have a proven for-
mat that is hugely successful and mo-
tivational for the CASE salesmen,” says
the charming Invernizzi.
He adds that the debut for the Dubai
event has successfully emulated the
showings in other territories.
“Our Commercial Training Team,
made up of ‘experts for the real World’,
Case says the design of the new 885B makes grading
operations “simple and highly productive”
Page 34
construction business news me December 2016
34
has delivered this format in Africa in
Tunisia, in 2015, then in South Africa
earlier this year, and now in Dubai,
which has been equally successful.”
The Case Eagle Days are designed to
provide product and commercial train-
ing for sales professionals throughout
the region, together with offering cus-
tomers the opportunity to see first-
hand the outstanding performance of
Case machines in action.
The event kicked off an unseason-
ably warm Sunday in the UAE and was
attended by 50 salesmen from eleven
countries, across the Middle East and
Kenya. The first two days included some
intensive training, before ending with a
Gala dinner on the Sunday evening.
The third day was dedicated to
customers. There was a live machin-
ery show plus product demonstra-
tions from expert CASE operators on
a wide range of equipment, which
clearly impressed the numerous cus-
tomers who attended.
According to Invernizzi, the format has
been deliberately designed to make the
most of a packed three-day schedule.
The first two days of the event were
organised and overseen by the CASE
Commercial Training Team, which
also included product specialists, who
provided both in-depth product walk-
arounds in the demonstration area,
plus classroom sessions in the two
marquees, erected beside the demon-
stration area. The third day was the
all-important chance to impress ma-
chinery and equipment buyers.
“The two days of training on CASE
machines are preliminary to the main
show on the third day, which enhanc-
es the relationship between salesmen
and customers,” explains Invernizzi.
The CASE Commercial Training
Team, including product specialists,
were on hand throughout to provide
advice on the best machine for each
application. He adds that the company
focuses on setting the right tone to en-
sure that the customers are welcomed
and the sales and technical teams have
the right environment to show the ma-
chines in the best light.
“Our CASE dealers throughout the
Middle East have really appreciated
the work that has been put in by our
EMEA Commercial Training team to
make everyone feel so welcome,”
says Invernizzi.
Case has worked hard over the
last few years to enhance its abil-
ity to make it easier for customers to
gain access to its machines in the re-
gion. Its network has been bolstered
and expanded and so has the team
on ground with it adding expertise
in spare parts, finance and market-
ing. This has resulted in a burgeoning
presence in the market; and the Eagle
Days event was also an opportunity to
talk about its most recent addition to
its offering: the opening of a new parts
facility in Dubai.
The new hub joins a list of seven
others that it operates throughout the
Europe, Middle East and Africa (EMEA)
region. According to Marco Baffoni,
director, Dealer Parts Support Services
EMEA, the facility will stock more than
11,000 part numbers and will be able
to cover demand for the entire region.
Being able to support customers rap-
idly to minimise their downtime will
be a crucial element in Case’s expan-
sion in the region.
“Thanks to this new site, delivery
times will be slashed of several days”,
says Baffoni. “Now we are able to sup-
ply our customer with parts within a
couple of hours.”
Unsurprisingly,
the
improvements
“Thanks to this new site,
delivery times will be
slashed of several days.
Now we are able to supply
our customer with parts
within a couple of hours.”
Thani Al Shirawi, Executive Director of Al Shirawi
Enterprises, Case's partner and one of the UAE's
leading equipment distributors
MACHINERY
Page 35
construction business news me December 2016
35
to parts delivery featured high on the
agenda on the third day. After a warm
welcome from Franco Invernizzi and
the members of the CASE management
team, it was time for a short presenta-
tion on the new parts depot facility be-
fore the show began. Customers could
see all the machines in action, including
CASE’s renowned 821F and 1021F Series
wheel loader, and what it claims are best
in class skid steer loaders (the compa-
ny’s compact equipment range has been
warmly received in the region).
This was followed by a full line walk
around, where product specialists talk-
ed about each of the machines capa-
bilities and innovative technology that
is setting very high standards in plant
machinery. There was also time for a
Q&A, to enable customers to put their
questions to the team.
There was plenty of other machines
to view at the event. In addition to
the wheel loaders and skid steer load-
ers, there was also its 570T backhoe.
According to Case, this machine is
considered its base entry backhoe
loader machine but is designed with
simple technology “making it ideal”
for the tough and challenging market
in the Middle East. It also claims that
the machine is easy to use and easy
to maintain in the market. The 570T
is fitted with its own FPT (Fiat Pow-
ertrain Technologies) engine, the ma-
chine is designed to have the power
to perform a full range of operations
demanded of a backhoe loader, be it
loading or excavating.
With infrastructure projects con-
tinuing to roll-out in the region, Case
also presented its 885B Motor Grader.
This machine is new to the UAE but
is a grader that comes with a strong
reputation in other markets around
the world.
According to Case, the design of
the 885B makes grading operations
“simple and highly productive”. The
machine once again features a FPT-
built engine which is coupled to a
fully automatic transmission. The en-
CASE IN Qatar
The Eagle Days event in Dubai
followed a few weeks after Case
and its official distributor in Qatar,
Nasser Bin Khaled & Sons Heavy
Equipment (NBK) hosted an Open
Day in the rapidly changing country.
At an event held at Regency
Hall, Case and its distributor – its
longest running dealer partner in the
region - demonstrated their range of
equipment to purchasing managers
and decision makers from around
the peninsula.
On display were models from the
Case’s heavy and compact ranges,
including the Case 821F wheel
loaders for the aggregate sector,
the SR150 and SR130 skid steer
loaders, 570T and 580T backhoe
loaders and TX170-45 telehandler.
Also on show were two 20-tonne and
37-tonne excavators that compete
in the country’s biggest segment,
crawler excavators.
“The Case Open Day helped
us create awareness about our
premium line of Case construction
equipment and educate our
potential clientele about our after
sales services, training, parts
support and financing solutions,”
said Raffi Keuylian, general
manager of Nasser Bin Khaled &
Sons – Heavy Equipment Division.
“We were able to meet key decision
makers and influencers and show
them what we can do for their
businesses. This was the first time
our heavy equipment division has
hosted an event of this size, and it
will be a trendsetter for our division.”
gine features variable horsepower, en-
abling operators to switch to the rel-
evant power requirement for the task
in hand. Case claims that this makes
the grader more productive and more
efficient. The 4.2m Case-designed
moldboard ensures efficient flow of
material enhancing productivity in all
ground applications.
Following a hard three days around
the machines, Case and its invitees
were able to relax under the palm
trees of the stunning Palmito Gardens
within the Jebel Ali Resort, before sit-
ting down to the Gala dinner in its
truly glamourous surroundings.
Franco Invernizzi (centre) says the Case Eagle Days
events are crucial ways to show what its machines can do
Page 36
construction business news me December 2016
36
Commercial Vehicles
Ford Trucks stood out at PMV Live, and Ercan Emrah Duman says it is
determined to continue to take on its more established rivals
By Matthew Treanor
Moving Forward
I
t has been two years since Ford
Trucks first burst onto the Middle
East scene to challenge the status
quo of the region’s truck market. Even
for a famous and global name like Ford,
this has been no easy task for interna-
tional markets director Ercan Emrah Du-
man and his team.
Pitching up at their basecamp in Dubai
in 2014, they faced the seemingly daunt-
ing task of scaling up to a summit that
competitors like Mercedes and Scania
had started to climb decades earlier.
“We have to be more aggressive than
them,” says the ambitious Duman as he
looks back on Ford Trucks’ progress to
date. “We are a latecomer and we have
to work harder and do things better
than the others.”
The recent progress of other rivals
such as Volvo and MAN Truck and Bus
and their chewing into market share
proves that buyers will be receptive
to new options – if the product is the
right one. Ford Trucks has also beaten
its own path since 2014, winning over
customers in areas that complement the
transmixer and tractor-head models it
has developed for the region.
Its presence at last month’s PMV Live
- while most of its competitors sat it out –
was an opportunity to show the strength
of its ever-evolving construction range
but also an indication that it cannot af-
ford to rest still. Duman admits its suc-
cesses, so far, have been hard won: “It is
very difficult in the start-up phase. Every-
body says their truck is the best quality
but you have to prove your confidence
in the product.”
Duman reveals its debut was the cul-
mination of two further years of devel-
opment and preparation. Much of the
early effort, he says, was expended on
developing what was to become its hot
climate package: a series of adaptations
developed especially for heavy truck
buyers in the Gulf.
“The temperature makes things diffi-
cult and we wanted to make sure that we
had the proper products,” he comments.
“For instance, we are using a high capac-
ity air conditioning unit, a high capacity
radiator to cool the engine down; even
inside the engine there are components
developed to be suitable for the weather
conditions in the region. We call it our
GCC package.”
He smiles broadly when he tells CB-
NME that the company has yet to experi-
ence a failure since launch (“I’m happy
to say that we haven’t yet faced any tem-
perature or dust trouble”) and is visibly
animated when he adds that it is able to
offer a two-year unlimited warranty and
in some markets three years. “And that’s
bumper to bumper,” he enthuses.
Passenger links
Beyond readying the trucks, there were
further the questions regarding where to
sell and who to partner with. Fortunately,
the company was able to fall back on its
passenger car links in the region.
“That was a good preparation pe-
riod,” he recalls. “We selected two key
markets to start with, Saudi Arabia and
the UAE, as our dealer partners there
were more ready. We always start with
our passenger car dealers and then we
analyse the business potential of being
with them. Our preference is always
existing Ford dealers, if we feel that
they are ready.”
Page 37
construction business news me December 2016
37
Despite a perceived lack of market-
ing gloss, selling trucks is arguably more
complicated than setting up to push cars
in any given market. Owners need to
push the limits of their trucks so they
earn their keep and the emphasis is on
the manufacturers and their dealers to
provide comprehensive support. The
vehicles often work in demanding and
extreme conditions in the Gulf; entering
into an already competitive market, Ford
Trucks knew its aftersales support had to
be razor-sharp.
“This is a completely different business
with its own layer of requirements: you
need different facilities, you need invest-
ment,” Duman explains. “Part of the anal-
ysis phase was identifying the resources
required to bolster the dealers operation
to the level required to support truck
sales. Aftersales is so important.”
With its dealer partners in place, the
Ford Trucks team was then free to join
them in targeting customers in a demand-
ing tour of the region’s workshops, of-
fices and sites: “We recognised that we
had a very good and unique product for
the region, especially in the transmixer
market because of the high level of infra-
structure projects,” says Duman.
“So we made the sales calls and vis-
ited them. At the end of the day, we are
in B2B not B2C. Therefore you need to
be in touch with these guys and also the
dealer - we are working as if we are one
with our dealers.”
Riyadh and beyond
The racking up of road and air miles
is beginning to bear fruit. Ford Trucks
is now a recognised player in both the
mixer and logistics sectors in the UAE. A
newly formed and devolved Riyadh of-
fice has also been tasked with spreading
its network and support presence in Sau-
di Arabia and Bahrain. Qatar and Oman
were recently entered and could soon be
joined by Kuwait, depending on-going
discussions with a dealer there.
He explains: “Of course there are areas
that we might have done better, but as a
start-up I think we did phase one prop-
erly. Now in phase two, it is about com-
plete country coverage. Expansion with-
in a country is so important. For instance,
we are only in Riyadh right now and you
can’t control the market just from there.”
Maintaining the pace of its growth
through expansion will be crucial as its
rival OEMs and dealers react to both
changing market conditions.
“It has been deliberate and a stra-
tegic plan where we wanted to make
sure that the business and vehicles
were ready. It is very easy to gain mo-
mentum but then lose it one day, one
month or six months. It is not in our
nature to rush in as a company – we
wanted to take it step-by-step.
“Sale-wise we have seen momentum.
Unfortunately, during the second year
the fuel prices fell and the truck industry
is always the first to be affected by the
economy - it is the first to be hurt but the
first to recover from a crisis,” he laments.
“In the UAE, we are achieving something
in the region of 5 percent of the total
market. But as we (currently) don’t have
a 6x4 tractor, we are only playing in 60
percent of the market. If we don’t include
it, then we have more than 10 percent of
the market.”
Two years down and into double fig-
ures, Ford Trucks is just getting started.
A new range for 2017
Last month saw Ford Trucks once
again take centre stage at PMV
Live in Dubai and CBNME was
impressed by its beefed-up 2017
Ford Trucks Construction Series of
vehicles - including its 4143M and
3543M mixers alongside the rugged
Cargo 1843T tractor head.
Headlining the improvements
being introduced in the 2017 is the
new Ecotorq engine - developed
like the rest of the range in Turkey
- which ramps the previous ratings
of 350PS and 1,400Nm of torque
up to 430PS and 2,150Nm. The
extra power is bolstered by greater
control via a new 400kW engine
break that enhances the driver’s
ability to negotiate difficult and
sloping sites. An optional 600kW
Intarder can boost breaking
capacity to a hefty 1,00kW.
Duman says that he expects a
6x4 tractor-head to be added in the
second half of 2017 as the company
continues to push forward in a
frequently trying market.
Page 38
construction business news me December 2016
38
COMMERCIAL VEHICLES
MAN Truck & Bus Middle East’s Franz Freiherr von Redwitz says
education for everyone is key to saving lives on the road
By Matthew Treanor
Putting Safety First
T
he battle to make the roads
of the UAE safer is slowly be-
ing won but there is still much
more to do if it is to achieve its
goal of three deaths per 100,000 popula-
tion per annum by 2021.
According to Brigadier Ghaith Al
Zaabi, director general of Traffic Coor-
dination at the Ministry of Interior, the
percentage of deaths decreased from
2008 to 2015 by 37 percent. Between
2014 and 2015 alone there was a drop
of 5.1 percent, bringing the number of
deaths per 100,000 below six (at 5.99)
for the first time.
The latest figures mark a fall from 6.71
per 100,000 in 2012 but there were still
almost 675 fatalities across the UAE in
2015. Unfortunately commercial vehi-
cle drivers and owners continue to be
a contributor to the list of accidents in
the country. For instance, according to
the latest Dubai Traffic Police figures,
there were 74 accidents last year in the
emirate; resulting in 13 deaths involving
heavy trucks and 97 accidents resulting
in 17 deaths involving light trucks.
German giant MAN Truck & Bus Mid-
dle East has placed itself at the forefront
of road safety initiatives in the Emirates,
providing training and advice to hun-
dreds of drivers, fleet owners and stake-
holders in recent years. Recognising its
own role to play in reducing fatalities,
managing director Franz Freiherr von
Redwitz says the automaker will con-
tinue to be engaged in a number of ac-
tivities it hopes will prove effective; and
ultimately save lives.
“With its global expertise in the field
of vehicle safety and road safety, MAN
can contribute in a number of ways in
enhancing road safety in the UAE – such
as supporting the introduction of road
transport regulations, providing train-
ing and education for transport opera-
tors and enforcement officers, and sup-
porting the introduction of mandatory
vehicle specification standards for new
product deliveries,” he comments.
November saw MAN host the inau-
gural Road Safety Event for Commercial
Vehicles event in collaboration with the
local government and safety campaign
organisation RoadSafetyUAE. The event
brought together representatives from
both the public and private sector to ex-
amine how heavy trucks and commer-
cial vehicles drivers and owners can be-
come safer and more responsible road
Monitoring of drivers is essential to lowering the
risks of accidents in fleets
MAN Managing Director Franz Freiherr von Redwitz
says all stakeholders must take road safety seriously
Page 39
construction business news me December 2016
39
users. It also highlighted the various
road safety initiatives and programmes
being carried out in the UAE, as well
as MAN’s own advice and insight into
making (its own and others’) heavy ve-
hicles safer.
MAN has worked tirelessly for years
in Europe and more recently the Middle
East to develop a huge variety of edu-
cational and technological initiatives. Its
trucks are equipped with a variety of
technology designed to improve active
and passive vehicle safety such as Elec-
tronic Stability Program (ESP) to pre-
vent accidents caused by overturning or
straying from the lane, Anti-Spin Regula-
tor (ASR) to aid controlled braking, and
Electronic Damping Control (EDC) to
optimise safety and handling.
Participants at the event were able
to learn how it continues to pursue im-
proved safety on UAE roads. They could
also take an interactive iPad-guided
‘Road Safety Walk Around’ tour of the
latest road safety technologies on two
visiting MAN trucks.
One of MAN’s most significant con-
tributions to road safety – ProfiDrive –
featured high on the agenda too. Held
across 25 countries, almost 4,000 driv-
ers, fleet managers, vehicle transfer per-
sonnel, driving instructors and special-
ists annually take part on MAN’s range
of training courses that combine theo-
retical and practical exercises that can
make every-day driving safer and more
economic.
“Improving road safety is one of our
highest priorities at MAN and we have
many products available today in terms
of technology solutions and driver train-
ing support which have been developed
after many years of research based on
various accident reports,” explains von
Reditz. “Designed to improve driver
knowledge and skills and promote ra-
tional driving behaviour based on safety
regulations, the courses are carefully tai-
lored to ensure drivers are fully trained
on how to avoid risks on the road based
on a cautious and safe driving style, and
seek to guide them on the correct way
to respond to critical driving situations.”
Von Reditz says he is an advocate of
warning against the dangers of driver
fatigue and of educating all road users.
He argues that all car drivers need to
understand factors surrounding stop-
ping distances, and how they can vary
depending on vehicle type and speed.
“However, when it comes to accidents
involving trucks, the results are usually
deadly,” he remarks. “For instance, a
semi-trailer truck takes roughly three
times more to stop than a car and hence
one must never pull in front of a semi-
trailer truck and brake abruptly.”
Turning his attention to fleet owners
and managers, he warns that it is es-
sential that they understand the value of
surrounding training with support and
monitoring.
“The impact of driver education and
training on vehicle performance and
safety is hugely underestimated in the
region. As a result, many fleet owners
are reluctant to invest in driver educa-
tion,” he says. “Also, there is a common
misconception that the current situation
can be changed solely by focusing on
driver education and training. While
driver education is of course hugely
important, the driver basically executes
what a supervisor or transport manager
requires, so it is paramount that fleet
owners and managers adopt a more
proactive approach to safety.”
Von Reditz and MAN understands
that it will need to continue to bring to-
gether the commercial sector and other
stakeholders if its campaign is to prove
a long-term success.
“Through our safety campaign, we
aim to highlight the top reasons that
impact road safety from a commercial
vehicle perspective such as load of the
vehicle, driver alertness, worn tyres and
incorrect/incomplete maintenance,” he
explains. “It is an important step to-
wards greater cross-stakeholder collabo-
ration that will help make the country’s
roads safer.
“MAN has an ongoing commitment
to improving road safety and we will
continue to offer our support and ex-
pertise to help the UAE achieve its road
safety targets. Targeted initiatives and
campaigns aimed at raising road safety
awareness and improving driver edu-
cation are essential to achieving these
goals, and this will continue to be a fo-
cus area for us moving forward.”
How truck users can
save lives
• It is not only the gross vehicle
weight that can affect safety. Load
positioning and distribution too
can have consequences for road
safety, hence it important to know
how to load your vehicle for safety.
Severe overloading of the drive
axle or under-loading of the trailer
axle can adversely affect steering,
braking and speed control.
• Tyre suitability is a vital link in the
load-to-road chain. Care must be
taken to ensure that the maximum
load rating for a tire is never
exceeded.
• Driver alertness is critical. If a
driver has not slept in 17 hours,
their driving ability is similar to a
driver who is driving under the
influence of alcohol. Today we
have technology alternatives
available - such as Tachographs
- to monitor driver working hours
which have a huge impact on
accident rates. The Tachograph
helps in enabling enforcement of
rules related to drivers’ hours, and
functions as an aid to road safety.
Using a combined speedometer
and clock, the Tachograph records
automatically on a paper disc the
vehicle’s speed, distance travelled,
and time spent on the road, helping
keep tired drivers off the roads.
• When it comes to braking, having
an understanding of the complete
interrelationship of systems is
important. Mismatch of tractor-
trailer combinations can result in an
unsafe vehicle in operation.
• Maintenance has a large part to
play in safety. Regular maintenance
is essential to ensuring the safety of
your vehicle and keeping it running
at peak efficiency.
Page 40
construction business news me December 2016
40
Event review
The 37th edition of the Middle East’s largest construction exhibition
surpassed expectations.
The Big 5 2016
breaks records
T
his year’s Big 5 construction
exhibition welcomed a record
breaking 75,000 visitors to
the Dubai World Trade Cen-
tre from November 21-24. H.H. Sheikh
Hamdan bin Rashid Al Maktoum, Depu-
ty Ruler of Dubai, opened the 37th edi-
tion of the four-day event which once
again took place alongside Middle East
Concrete and PMV Live. In all, over
3,100 exhibitors showcased thousands
of solutions for the built environment,
eager to tap into the billions of dollars-
worth investment going into the region-
al construction sector.
Making its debut at this year’s event
was one of the biggest companies in
the world. Microsoft participated as
the lead technology partner and dem-
onstrated a range of products that en-
able construction companies to im-
prove performance, communication
and use data in real time.
”With over 3,700 projects currently on-
going across the Emirate, valued around
an estimated $400bn, Dubai’s construc-
tion market is on a constant upward tra-
jectory,” said Samer Abu Ltaif, Regional
General Manager, Microsoft Gulf.
“The significant shift towards smart
and sustainable solutions, and the in-
troduction of new building regulations,
are encouraging companies to look
for innovative ways of working - that’s
where technology plays a pivotal role.
Microsoft devices and solutions, built
from the ground up are an accelerator
for businesses in the construction sector,
enabling them to thrive in a mobile-first
75,000
Visitors at The
Big 5, 2016
Page 41
construction business news me December 2016
41
cloud-first world; bridging technological
gaps and allow them to achieve more.”
This year’s Big 5 edition had several
key features including dedicated prod-
uct sectors, live product demonstrations,
a one-day Excellence in Construction
Summit, a tools demonstration besides
a new floorplan layout clustered in
five product sectors. The five product
sectors were: Building Interiors & Fin-
ishes, MEP Services, Building Envelop
& Special Construction, Construction
Tools & Building Materials, and Smart
Building & Design technologies.
Another key highlight of the show
was the “Excellence in Construction
Summit” on the sidelines of the exhibi-
tion which drew 500 industry leaders to
discuss trends in the construction sector
in Dubai, the GCC region and beyond.
Middle East Concrete (MEC)
and PMV Live 2016
As the GCC gears up for mega events
such as Expo 2020 and the FIFA World
Cup 2022 in Qatar, the region’s infra-
structure and heavy machinery indus-
try has turned its focus towards inno-
vative products to keep up with the
infrastructure boom.
Liebherr Concrete Technology, one
of the world’s largest manufacturers of
construction machinery with more than
41,500 employees, was at Middle East
Concrete (MEC) and PMV Live 2016 in
place of their distributor for the first
time, in order to talk directly to their
customers in the Middle East.
Samir Hussain, sales manager, Liebherr
3,100
Exhibitors at
The Big 5, 2016
HH Sheikh Hamdan Bin Rashid Al
Maktoum opens The Big 5, 2016
How to do Business in the UAE
Seminar - The Big 5 2016
Page 42
construction business news me December 2016
42
Event review
Middle East, said: “When the concrete
industry has exhausted the same means
for years, it is time to focus more on in-
novation. The Liebherr product develop-
ment team is doing an exceptional job
in growing the product range, catering to
changing customer and market changing
demands, optimising energy efficiency,
redefining value for money and get-
ting the best return on investment while
heightening performance levels.
“MEC & PMV Live 2016 has provided
us with the optimum platform to meet
with our target audience from across the
GCC, as well as a wider Middle East.
We have met many customers from the
UAE, Kuwait, Oman, and KSA, with
some visiting the show from as far as
Europe.”
Lachezar Kamburov, sales director of
Podem Cranes from Bulgaria, the local
market offers great opportunities for
construction manufacturers: “Concrete
market in the Middle East is much big-
ger than in Europe. Concrete and pre-
cast concrete factories in the region are
extremely well developed.”
Podem Cranes, distributed by MET
Cranes in the Gulf, was at PMV Live
and MEC for the first time ever. “We
are very satisfied with all the visitors
we met. Here, we are launching new
electrical components and electrical
systems, and we are also promoting
our latest developments, like the tan-
dem control, which is very important
for concrete and precast factories.”
Over the four days of the event, thou-
sands of visitors benefitted from 50 free-
to-attend CPD (continuing professional
development) certified seminars, forums
and workshops highlighting the mar-
ket’s current trends, challenges, oppor-
tunities and best practices.
During one session, delegates were
introduced to the role of telematics in
the Middle East's construction industry
where the focus is on creating solutions
that can interoperate with one another.
Also on the agenda were the topics of
arbitration and dispute resolution in
construction claims, precast innova-
tions for sustainability and competi-
tiveness and integrated reliability and
durability based structural health moni-
toring in concrete structures.
Looking forward to 2017
Following this year’s success, the next
edition of The Big 5 will further focus
on the theme of ‘Technology in Con-
struction’. Event Director, Josine Heij-
mans, also said HVAC-R exhibitors will
be clustered in a dedicated product sec-
tor in light of the heating, ventilation, air
conditioning and refrigeration industry’s
strong development in the Region.
Moreover, The Big 5 2017 will go
smart. Thanks to the introduction of the
new Konduko smart technology, exhibi-
tors will be able to send digital content
to visitors, while capturing and qualify-
ing leads from their smart phones. All
visitors will be equipped with a Smart
Badge that will interact with the exhibi-
tors’ Smart Readers.
“With its record-breaking number
of exhibitors and visitors attending the
event, The Big 5 2016 was a great suc-
cess, and the show will be even bigger
and smarter next year,” Heijmans said.
Live Product Demonstrations
were a feature of the event
Page 43
construction business news me December 2016
43
Mark Westermeyer, marketing director, KIMMCO explains
why exhibiting at The Big 5 is so important to the company.
Minutes with…
Briefly tell us about your
business offering
KIMMCO is a Kuwait-based company,
established in 1977, with a proud history
of supplying energy efficient insulation
solutions for buildings such as roofs,
walls, floors and metal structures as
well as HVAC (Heating Ventilating and
Air conditioning). Some of our refer-
ence projects across the region include
Burj Khalifa, Burj Al Arab, Etihad Tow-
ers in the UAE, Princess Nora University
in Saudi Arabia, Aspire Tower and Burj
Qatar in Qatar and the Kuwait Towers
and Al Hamra Tower in Kuwait, to name
a few.
Why is BIG 5 important to you?
KIMMCO has always participated at
the BIG 5 Dubai as we consider the ex-
hibition to be the leading building and
construction event in the GCC, and we
will continue to participate in such big
and important events. As a leading in-
sulation solution provider across the
MENA and SE Asian region, we look for
specific events that help us to showcase
our unique portfolio of solutions and su-
perior technical services to our clientele.
The Big 5 attracts the required audience
and creates a platform for us to do just
that – allowing us to meet and interact
with a broad group of stakeholders, in-
cluding existing and potential custom-
ers, key decision makers and govern-
ment officials. This is in line with our
vision to be the best multi-insulation
solution provider in the region, and to
solidify our market leadership.
What are you showcasing at
the show?
During BIG 5, KIMMCO presented CLI-
MAVER, an innovation for the HVAC
market in GCC. This lightweight pre-
insulated ductwork system enables de-
signers to meet the stringent thermal,
acoustic and fire performance require-
ments of the HVAC market. CLIMAVER,
as an all-in-one alternative to sheet-
metal, saves valuable space, saves on
logistics and reduces installation time.
An extra benefit is that no additional
insulation work is required once it is in-
stalled. Hence it is more cost-effective
in comparison to traditional metal duct-
work. KIMMCO is promoting CLIMAVER
in the GCC under the license of Saint-
Gobain ISOVER, a worldwide leader in
insulation solutions. We also displayed
the Self-Seal in roll form and ECOBUILD
range of insulation. Self-Seal is a glass
wool insulation product with factory
laminated adherence that is also used in
the HVAC market.
What challenges are you
facing at the moment?
Besides the uncertain economic situa-
tion in the GCC, it is the low awareness
of what insulation solutions are able to
provide when it comes to energy sav-
ings and reduced CO2 emissions. This is
where we need to be more active espe-
cially when looking at the future of our
children. Reducing energy consumption
will also benefit private owners as well
as public authorities by saving on en-
ergy bills and reducing capex.
New regulations with increased en-
ergy saving requirements in some Eu-
ropean countries lead to a decrease of
energy consumption of up to 30 percent
in recent years. The EU has set itself a
20 percent energy savings target by 2020
– roughly equivalent to turning off 400
power stations. It would be a chance for
our region too. The economic situation,
especially when looking at the low oil
price level, forces GCC Governments to
re-consider expenses, e.g. subsidies on
energy consumption.
Together with the constant rise in en-
ergy demand in the region, which will
requires further investment in power
plants, better thermal insulation of e.g.
residential and commercial buildings
will have a big impact. Additionally,
Green Building certification programs
as LEED, QSAS and Estidama are em-
phasizing cost effective and sustainable
buildings and help to support this.
“Reducing energy
consumption will benefit
private owners as well
as public authorities by
saving on energy bills and
reducing capex”
- Mark Westermeyer
Page 44
dealing with defects. These provisions
can be divided to three phases (a)
during construction, (b) at the time of
issuing the Taking-Over Certificate and
(c) prior to the issuance of the Final
Completion Certificate.
During Construction Phase
During the construction phase, Clause
7.6 FIDIC titled “Remedial Work” sets
an obligation on the Contractor to
comply with the Engineer’s instruc-
tions requiring the Contractor to (a)
remove and replace any Plant or
Materials which are not in accordance
with the Contract, (b) remove and re-
execute any other work which is not
in accordance with the Contract; or (c)
execute any work which is urgently
required for the safety of the Works,
whether because of an accident, un-
foreseeable event or otherwise.
The wording of this provision is
quite wide and captures various
types of defects. The Contractor’s
failure to abide by the Engineer’s
instructions within the time-limit set
therein entitles the Employer to hire
and employ another contractor to
carry out such remedial works at the
Contractor’s cost.
Taking-Over Certificate Phase
Once the works are nearing comple-
tion; the Engineer will start prepar-
ing the Taking-Over Certificates
for the Works. On most projects;
typically minor work items remain
Defective works: who
is liable for what?
Determining whether a defect is indeed a defect and the
liability for such a defect is rarely a straight forward matter,
says Heba Osman, Partner, Fenwick Elliott.
O
ne of the major rea-
sons for construction
disputes is defective
works. This probably
does not come as a sur-
prise as determining whether a defect
is indeed a defect and the liability for
such a defect is rarely a straight for-
ward matter. It is usually a matter that
requires answering various technical
and legal questions.
Defective works can arise as a
result of (a) design deficiencies, (b)
material deficiencies, (c) workman-
ship deficiencies or (d) incorrect or
inaccurate specifications.
The type of defects appearing in a
construction project may vary from mi-
nor defects that can be rectified prior
to the completion of the construction
works to a major defect that threaten
the safety or stability of the construct-
ed works and appears several years
after the handover of the project.
This article will consider the Con-
tractor’s liability as a matter of contract
and UAE law in respect of the differ-
ent types of defects arising out of a
construction contract.
Contractual Liability for
Defects
Most standard form construction con-
tracts contain different provisions that
deal with defects arising at the differ-
ent phases of construction or there-
after. The FIDIC 1999 Red Book (the
FIDIC) provides several provisions
Heba Osman,
Fenwick Elliot LLP
construction business news me December 2016
44
Legal viewpoint
Page 45
to be completed; and these minor
items (also typically referred to as
snag list items) do not affect the
Employer’s ability to use the Works.
The Contractor is required to com-
plete these snag list items, however,
they should not hold up the issu-
ance of the Taking-Over Certificate
as indicated in Clause 10.1 (a) FIDIC
which requires the Engineer to issue
the Taking-Over Certificate stating
the date on which the Works or Sec-
tions were completed in accordance
with the Contract, except for any
minor outstanding work and defects
which will not substantially affect
the use of the Works or Section for
their intended purpose (either until
or whilst the work is completed and
these defects are remedied).
Defects Liability Period
Once the Taking-Over Certificate is issued,
the Defects Liability Period (DLP) starts
and is typically for a period of 12 months
(although it can be longer or shorter
depending on the parties’ agreement).
During this DLP the Contractor is required
in accordance with Clause 11 FIDIC to (a)
remedy all snag list items and (b) remedy
any defects that appear in the works at the
Contractor’s cost. The Contractor’s failure
to carry out the remedial works would
also entitle the employer to hire another
contractor to carry out the remedial works
at the Contractor’s cost.
Liability for Defects as a
matter of UAE law
In addition to the provisions contained
in a typical construction contract, the
UAE Civil Code adds another layer of
protection to employers in respect of
defective works. The UAE Civil Code
also appears to divide defects into
two categories; (a) defects during the
carrying out of the works and (b) after
handover of the works.
During Construction Phase
As a matter of law, the Contractor is
required to complete the works in
accordance with the conditions of the
contract. However, if the Employer
finds that the works are not carried
construction business news me December 2016
45
Page 46
construction business news me December 2016
46
Legal Viewpoint
out in the manner stipulated in the
contract or are being carried out in a
defective manner; then the Employer
may be entitled to terminate the con-
tract if the defective works cannot be
rectified. In this respect Article 877 of
the Civil Code states:
The contractor must complete the
work in accordance with the condi-
tions of the contract. If it appears
that he is carrying out what he
contracted to do in a manner that is
defective or contrary to the condi-
tions [of the contract], the employer
may demand that the contract be
cancelled immediately in the event
that it is impossible to make good
the work, but if it is possible to
make good then the employer may
require the contractor to abide by
the conditions of the contract and to
rectify the work within a reasonable
period, and if the period expires
without the rectification having been
done the employer may apply to
the judge to cancel the contract or
to give him leave to engage another
contractor to complete the work at
the expense of the first contractor.
As it can be seen, if the works can be
rectified then the Employer is first re-
quired to give the Contractor a notice
to rectify the works. If the Contractor
fails to comply with the notice; then
the Employer is required to apply to
the court for a decision to hire another
contractor to complete these works.
At the outset, this Article would ap-
pear to contradict with the contractual
provisions allowing the Employer to
hire another contractor to complete
the works; specifically in so far as the
question as to whether a court deci-
sion is required before hiring another
contractor. The general position of
the UAE Courts is that the contrac-
tual provision overrides this Article
877, and no need to revert to court
first before hiring another contractor.
However, it is advisable when draft-
ing similar contractual provisions to
stipulate clearly that the Employer has
the right to hire another contractor
without need for a court decision or
any other further action.
Post Hand-Over
The UAE Civil Code, and most other
civil law jurisdictions, provides for an
additional liability to both the Con-
tractor and the Engineer in respect of
defects affecting the safety or stability
of the constructed works. This liability
is the infamous decennial liability.
This decennial liability is provided
for in Article 880 of the UAE Civil
Code, and the parties may not contract
out of it. It is a mandatory provision
that applies whether the parties agree
to it or not. This Article reads:
(1) If the subject matter of the
[construction contract] is the erection
of buildings or other fixed structures
the plans for which have been made
by an architect with the intention that
the contractor shall carry them out
under his supervision, they shall be
jointly liable to pay compensation to
the employer for any total or partial
destruction occurring within ten years
to the buildings they have constructed
or the installations they have erected,
as well as for any defect that threatens
the stability and safety of the building,
unless the contract has provided for a
longer period of time, or unless it was
the intention of the contracting parties
that such installations should remain
for a period shorter than ten years.
(2) The liability to pay compensa-
tion as aforesaid shall endure notwith-
standing that the defect or collapse
arises out of a fault in the land itself
or that the employer consented to
the erection of defective buildings or
installations.
(3) The period of ten years shall
commence as from the time that deliv-
ery of the work is taken.
It is important to note that even
if the defective works were autho-
rized or accepted by the Employer,
this would not diminish in any way
the liability of the Contractor or the
Engineer. In conclusion, liability for
defective works is a serious matter
that should be thoroughly considered
at the time of entering the construc-
tion contract to determine which type
of defects that Contractor is liable for.
The wider the wording of a provision,
the wider the liability to be incurred.
Page 47
Page 48
construction business news me December 2016
48
SUPPLIER News
Z
ahid Tractor & Heavy Machinery Co.
and Renault Trucks have launched two
new distinct truck ranges that will be
produced in Saudi Arabia.
The new ranges, ‘C’ and ‘K’ were introduced
by Renault Trucks’ Global and Regional leader-
ship on October 25, 2016 at an event at the Ara-
bian Vehicles & Trucks Industry Ltd (AVI) facility
in King Abdullah Economic City. The factory was
designed by a Volvo/Renault Trucks and is one
of the first in the world to assemble both Volvo
and Renault trucks on the same line.
Gregoire Blaise, Vice President Renault
Trucks Middle East, said: “These trucks have
been tested for over a year in Oman in some of
the toughest regional settings. The new Renault
Trucks ranges performed extremely well with no
issues reported. This is vital for businesses who
need to be able to rely fully on their vehicles for
maximum productivity.”
Each model can easily be adapted to a wide
range of applications and customer demands
found within the distribution and construction
segments.
The ‘C’ range will enter the market with two
options of cabin width designed for specific
jobs. The 2.3 metre cab is built for distribution
and deliveries while the 2.5 metre cab is for long
haul, light construction and heavy distribution.
The ‘K’ range offers new standards in dura-
bility and robustness and has models that suit
the harsh demands of the construction industry.
E
mirates
Motor
Company
(EMC), the Mercedes-Benz
authorised dealer in Abu Dha-
bi and the flagship company
of Al Fahim Group, and Daimler Com-
mercial Vehicles Middle East show-
cased the Mercedes-Benz Zetros, an
off-road utility truck for extreme oper-
ations, at the Abu Dhabi International
Petroleum Exhibition and Conference
(ADIPEC) last month.
The heavy-duty truck is available
in two- and three-axle variants (4x4
and 6x6), offering GVW from 18 to
40 tonnes. The top-of-the-range 3643
AS 6x6 Tractor-head model exhibited
at Adipec boasts an impressive GCW
of up to 116 tonnes. In-line 6-cylin-
der engines available for the Zetros
range from a 7.2l version with 326 hp
up to the powerful 12l variant sport-
ing 428 hp.
Bilal Al Ribi, EMC Daimler CV gen-
EMC, Mercedes-Benz
showcase Zetros at Adipec
VEHICLES
Vehicles
Zahid Tractor and
Renault Trucks
launch new
trucks in KSA
eral manager, said: “Offering excep-
tional ride comfort and stability on
the most extreme off-road terrains, the
Zetros is ideally suited for tough appli-
cations and operations such as mining,
oilfields and quarries.
“Given its outstanding high load-
bearing capacity and ability to meet
today's extreme operating conditions,
we are confident that the Zetros will
soon become the preferred choice in
the high-performance construction
vehicles segment."
The truck sports robust planetary
hub reduction axles with high ground
clearance and single or twin tyres, up to
four differential locks, and a two-stage
transfer case, providing the foundation
for outstanding capabilities in off-road
terrain. A tyre pressure control system
offers choices for on- and off-road use,
driving across sand, and a particularly
low air pressure for extreme situations.
Page 49
construction business news me December 2016
49
H
itachi Construction Machinery Middle East
(HMEC) has appointed Middle East Crane
Equipment Trading (MECET) as its new
UAE dealer for Hitachi Construction Ma-
chinery as well as Hitachi Sumitomo Crawler cranes.
The agreement was signed by HMEC President
Hidefumi Sameshima and MECET Director Jos
Luyckx, in the presence of HMEC General Manager
Piet van Bakergem and MECET GM Wim Aernouts
at the Abu Dhabi International Petroleum Exhibi-
tion and Conference (ADIPEC) 2016 held in Abu
Dhabi from 7 to 10 November.
MECET being a 100% subsidiary of the Luyckx
Group was established in 1952 in Brecht in the
province of Antwerp in Belgium. The knowledge,
experience and skills the company has acquired
over 60 years has made it the market leader in
its home market of Belgium and excellent in sup-
plying machines for projects all around the world.
T
erex Equipment Middle East
has strengthened its sales and
service local coverage for Ge-
nie products in Qatar by add-
ing Manlift Qatar to its existing distrib-
utors’ network.
The agreement enables Manlift Qa-
tar to supply the full range of Genie
equipment within the region, includ-
ing Genie aerial work platforms and
telehandlers as well as Terex light tow-
ers, through all channels within the
Qatar market place.
Manlift Qatar will act as a full ser-
vice provider offering technical sup-
port and maintaining a stock of spare
parts to help maximizing equipment
uptime.
“Having Manlift on board is an excit-
ing and logical step for our business
here in the Middle East in order to be
increasingly responsive and flexible
on a local base” said Gary Cooke, Re-
Machinery
Machinery
Terex adds Manlift Qatar to
the Genie distributor network
Hitachi Construction Machinery appoints new UAE dealer
MECET is well known for its outstanding after sales
support and has an impressive stock of spare parts
that will be available across the UAE to serve their
customers around the clock.
“The Company is scheduled to open its new one-
stop 10,000 m2 facility in the Dubai investment cen-
ter near Al Maktoum International Airport for sales,
service and spare parts by the end of 2017,” said
Piet van Bakergem. “We are confident this union
with MECET will reinforce our joint position in the
construction machinery and crawler crane market
for the UAE territory.”
gional Sales Manager, Terex AWP.
“By providing comprehensive sup-
port both before and after purchase,
our qualified and experienced stra-
tegic partner aims to make the buy-
ing process easy for our customers,
whether they need a single machine
or a whole fleet. They will offer a full
after-sales service for warranty and
routine maintenance, spare parts and
repair for new and existing Genie
products and Terex light towers.
“As Genie continues to expand its
product offering introducing innova-
tive new products, our customers can
rest assured that we’ve got the right
partners to continue providing the
highest level of service” he added.
Page 50
construction business news me December 2016
50
A
VK Saudi Valves Manufacturing Com-
pany (AVK) has signed a long-term
contract with King Abdullah Economic
City (KAEC) to supply high quality
valves and fire hydrants for the fast expanding
city.
With an annual turnover of approximately
SAR 2.2bn ($586mn), AVK is one of the world’s
largest manufacturers of valves, pipes and
hydrants, focusing their expertise primarily on
these core product areas.
The company has been manufacturing locally
in the Kingdom for over 30 years, and supplies
projects across Saudi Arabia, Qatar and the UAE.
“AVK places the support of Saudi Arabia’s
economy at the center of its business prac-
tices. Offering world-class skills and expertise
to Saudi employees, we are currently on track
to soon reach Saudization levels of over 40%,”
said Ole Hedegaard, Managing Director of AVK.
“Partnering with KAEC, a city designed to
support the growth of Saudi into the future, is a
natural direction for us, and we are very excited
about the level of sustainable, high quality proj-
ects being developed there.”
Situated on the west coast of the Kingdom
of Saudi Arabia, King Abdullah Economic City
(KAEC) is the largest privately-funded new city
in the world covering an area of 181 square ki-
lometers of land. The city is under development
by Emaar, The Economic City, a publicly listed
Saudi joint-stock company established in 2006.
F
innish lift and escalator spe-
cialist KONE has won a pair
of big orders in the Middle
East in quick succession.
The company will supply 49 eleva-
tors, 82 escalators and 8 horizontal
autowalks for the Lusail Light Rail
Transit system currently under con-
struction north of Doha, Qatar. De-
veloped by Qatar Rail, the new sus-
tainable transport system will serve
250,000 inhabitants of the new city of
Lusail and be used by around 40,000
daily visitors.
KONE followed up the contract
with an order for 32 elevators and 4
escalators to be installed in the three
buildings of a mixed-use building
complex under construction at the
Double delight for KONE
AVK to supply
valves and
hydrants to
KAEC
SUPPLIER News
Dubai World Trade Center (DWTC).
Twenty two KONE MiniSpace eleva-
tors and ten KONE MonoSpace eleva-
tors will enable smooth people flow
in twelve elevator shafts. The KONE
E-Link remote monitoring system
will provide real-time information on
equipment status and performance.
Built on just over 1 km2 land, One
Central includes nearly 300,000 m2 of
Grade A1 offices and retail space to-
gether with five, four and three star
hotels, serviced apartments and a
club and lofts tower.
In April KONE also won an order
to supply elevators and escalators
for Doha Metro’s Red Line South and
Gold Line and a 20-year maintenance
agreement.
Page 51
construction business news me December 2016
51
G
lobal water technology outfit Xylem has
opened a new pump rental and service busi-
ness in Dubai to serve growing demand from
the construction and infrastructure sectors
across the Middle East and North Africa (MENA).
Xylem’s pumps and dewatering solutions play a
key role in various stages of construction projects
by keeping project sites free of unwanted water
throughout the project build. The dewatering hub
in Jebel Ali provides solutions from the company’s
Flygt and Godwin brands.
The new hub will serve customer needs for tem-
porary and long-term rental solutions, and provide
access to thousands of Xylem rental assets capable of
addressing complex dewatering challenges.
It follows the company’s announcement in Janu-
ary this year of a $35mn investment in expanding its
operations in the region.
“This new hub is part of a larger, significant invest-
A
l-Futtaim
Engineering
(AFE) has teamed up with
EuroVentus to collaborate
on future projects across
the UAE covering fans, filtration and
air handling units especially tailored
to operate in extreme weather condi-
tions.
EuroVentus is a widely recognised
supplier of home ventilation, heat re-
covery ventilation, condensation con-
trol, heat exchange ventilation and
ventilation extraction systems.
Dawood Ozair, Senior Managing
Director of Al-Futtaim Engineering
and Technologies said: “Through this
association, we are in a position to
provide innovative and cost- effec-
tive cooling solutions for various con-
struction sectors including shopping
malls, hotel buildings, and residen-
tial complexes as well as commercial
towers.”
Rajesh Devidas Bhatia, General
Manager, Air Conditioning Division,
Al-Futtaim Engineering added: “Eu-
roVentus Ventilation products will
complement our air conditioning so-
lutions in the construction industry.
Appropriate ventilation with high
energy efficiency standards is a key
aspect of Green building solutions
which is the future trend.
“The EuroVentus products are of
very high quality and comply with the
construction industry specifications. I
am confident that our customers i.e.
developers, building owners, consul-
tants and contractors will benefit with
EuroVentus products in the ventila-
tion solutions for their upcoming and
retrofit projects.”
Al-Futtaim Engineering partners with
EuroVentus
Xylem opens water pump business in Dubai
ment we are making in the MENA region as we work to
solve our customers critical water challenges,” said David
Flinton, Senior Vice President and President of Xylem's
Dewatering business.
Page 52
construction business news me December 2016
52
SUPPLIER News
R
ubber World Industries (RWI) is to
invest $2mn to triple production at its
factory in Ajman, UAE to meet surging
demand for closed-cell rubber insula-
tion in the Gulf and South East Asia.
The investment covers new production lines,
equipment and a laboratory to boost capacity
at the facility by the first quarter of 2017, the
Shaikhani Group company said in a statement.
RWI will also introduce Glass Wool Thermal
Insulation to its line of products. Glass Wool
Thermal Insulation comes in the form of boards
and sheet rolls manufactured from stable glass
fibres bonded with thermo setting resins, and
free from coarse fibres and shot, making it easy
to handle and cut to fit rectangular ducts and air
handling equipment.
The manufacturer currently holds a 60 per-
cent share of the Middle East rubber insulation
market and recorded over AED 42mn in sales
revenues in 2015. The company also meets
55 percent of the region's demand for rubber
insulation pipes and sheets, and other rubber-
derived products.
Established in 1993, Rubber World Industries
is the only manufacturing facility in the GCC that
produces a versatile range of rubber insulation
products to meet requirements in oil and gas
fields, construction, shipping and automobile
industries. Its modern plants are located in the
Ajman Industrial Area, where Gulf-O-Flex - its
flagship product is being manufactured.
I
ndustrial concrete flooring spe-
cialist Twintec reported its most
successful year of trade in Oman
after posting a 40 percent sales
surge in 2016.
The Belgium-based firm, which first
started trading in Oman 2011, has se-
cured orders to design and construct
195,900 square metres of large panel
‘jointless’ steel-fibre reinforced con-
crete (SFRC) floor slabs in the Sul-
tanate this year compared to 138,874
square metres in 2015.
Between 2011 and 2014 it supplied
just 59,900 square metres of concrete
flooring to Oman.
Twintec technical and commer-
cial director Tom Menary, who leads
the firm’s operations in Oman, said
the Sultanate is a key target market
Twintec reports record
year in Oman
Rubber World
to invest $2mn
to expand
Ajman factory
within the MENA region after success-
fully delivering 16 projects in the last
five years. In total Twintec has now
designed and constructed 800,000
square metres of large panel ‘joint-
less’ SFRC industrial flooring to the
Middle East region, excluding Saudi
Arabia.
Belgium-headquartered
Twintec
developed a strong presence in the
Middle East after securing its first ma-
jor contract in Saudi Arabia in 2007.
It now has representation across the
UAE, Bahrain, Qatar and Oman with
a subsidiary in Saudi Arabia.
With a global turnover of around
EUR 200mn ($217mn), Twintec pro-
duces more than six-million square
metres of industrial flooring slabs
worldwide each year.
Page 53
Page 54
construction business news me December 2016
54
Event Preview
Infrastructure investment provides backdrop to the construction machinery event in December
BAUMA CONEXPO
INDIA 2016
T
he UAE-India Joint Working
Group on Infrastructure Invest-
ments recently met to discuss
investments from UAE institutional in-
vestors in infrastructure developments
in India. In a significant move, the Abu
Dhabi Global Market (ADGM) and the
Confederation of Indian Industry (CII)
also signed an agreement to jointly col-
laborate on initiatives that further bolster
the business developments and oppor-
tunities between the two nations.
Currently India is among the fastest
growing economies in the world with a
GDP growth rate at 7.9 percent. But to
sustain this growth, India needs to focus
on developing its infrastructure sector.
According to the latest budget, the Modi
government has committed to boost to-
tal infrastructure spending by 22 percent
over the next two years.
Germany Trade & Invest (GTAI) in
a recent report stated that expressway
construction in India in 2016/17 is to be
expanded to 15,000 km compared with
6,000 km the year before. British market
research company Off-Highway Research
envisages that approximately 55,000 con-
struction machines are expected to be
sold in India in 2016, thus climbing steadi-
ly to more than 71,000 units by 2020.
With this huge predicted growth in
mind, the bC Expo India construction
equipment trade show to be
held in Delhi from Decem-
ber 12 to 15, 2016 has
been rebranded BAUMA
CONEXPO INDIA. The
format of the show’s
fourth edition is more
in line with what the or-
ganisers do international-
ly under the same banner.
Expressing his delight at
the response garnered to date,
Igor Palka, CEO of organiser bC Expo In-
dia, said: “Joint booths from China, Ger-
many, Italy, North and South America as
well as Spain are already currently regis-
tered. A total of 28 countries will be par-
ticipating at the event. That clearly shows
how important BAUMA CONEXPO IN-
DIA is for international companies.”
Covering 150,000 m2, the December
expo is expected to showcase approxi-
mately 700 exhibitors and host around
30,000 plus business visitors. Big names
confirmed to exhibit at the 2016 event
include ACE, Ajax Fiori, Ammann Apol-
lo, ASTEC, BAUER, BKT, Case, Cat-
erpillar, Columbia Machines,
Haulotte,
Herrenknecht,
JCB, Kobelco, KYB Con-
mat, Liebherr, Linnhoff,
Liugong,
Macons,
MAN, Marini, Masa, Po-
tain, Putzmeister, Puz-
zolana, Sany, Schwing
Stetter, Soilmec, Top-
werk, Wacker Neuson,
Volvo, Wirtgen and XCMG.
Representatives from the UAE
include Combifloat, Golf Scaffolding
Factory/Perfect Steel, and Middle East
Plant and Equipment will participate at
BAUMA CONEXPO INDIA 2016. The
event takes place at HUDA Grounds in
Gurugram located just 20 minutes away
from Delhi’s domestic and international
airports, offering visitors and exhibitors
convenient access to the show.
700
Exhibitors at
Bauma Conexpo
2016
Page 55
Jo D’Costa
Jo@BncpuBlishing.net
+971 50 440 2706
For sponsorship opportunities
VishVanath shetty
vish@BncpuBlishing.net
+971 52 674 5378
ConstruCtion
innovation
AwArds
QATAr
ManU PaRMaR
manu@BncpuBlishing.net
+974 3332 5038
10Th MAy 2017
Page 56
construction business news me December 2016
56
Bauma Conexpo
December 12-15, 2016
Huda Ground, Gurgaon, Delhi
BAUMA CONEXPO INDIA—the International Trade Fair
for Construction Machinery, Building Material Machines,
Mining Machines and Construction Vehicles—provides the
construction industry in India with a professional platform
for networking, investment and the exchange of ideas and
information.
Ras Al Khaimah Finance & Investment
Forum (RAKFIF)
December 13-14, 2016
Rixos Hotel Bab Al Bar
An international business investment and finance forum bring-
ing together experts from government and leading industries
with international and regional investors and financiers to
explore business opportunities in the emirate.
Intersec
January 22-24, 2017
Dubai International Convention and Exhibition Centre
Intersec 2017 will present over 1,300 exhibitors that will show-
case a truly comprehensive range of products across SEVEN
broad sections: Commercial Security, Smart Home, Informa-
tion Security, Fire & Rescue, Safety & Health, Homeland
Security & Policing and Perimeter & Physical Security.
Mark your calendar
SAVE THE DATE
Housing and Residential Development
Middle East Conference
January 30-31, 2017
Dubai, UAE
Join key developers, government authorities, architects and
consultants to gain insight into current and future projects and
understand the challenges they face around reducing con-
struction costs, financing, middle-income housing, mixed-use
developments and sustainability.
Kuwait Build 2016
March 6-8, 2017
Kuwait International Fair, Kuwait City
Kuwait Build Exhibition & Conference will feature over 200
local and international companies in the building and con-
struction sector showcasing the latest products and services in
residential and commercial property infrastructure in a busi-
ness platform of over 4,500 sqm of exhibition space.
CONEXPO-CON/AGG 2017
March 7 – 11, 2017
Las Vegas, Nevada
Where every major construction industry is represented
amongst 2,500+ exhibitors over 2,500,000 square feet and
more than 140 education sessions including asphalt, ag-
gregates, concrete, earthmoving, lifting, mining, utilities and
more.
Construction Business News ME picks the latest and most sought-after
exhibitions, conferences and seminars coming up in the construction industry
Page 57
BAUMA CONEXPO INDIA 2016
December 12-15
HUDA Ground, Gurgaon/Delhi
GET YOUR TICKET NOW!
www.bcindia.com/register
Page 58
construction business news me December 2016
58
Editor's pick
The UAE is positioning itself to be at the forefront of the Hyperloop revolution
Pipe dreams?
T
he possibility of transporting
goods and people around the
UAE via high speed Hyperloop
is closer to reality following a string of
breakthrough deals involving a US de-
veloper of the technology with govern-
ment backed firms and agencies.
The concept – which involves a low-
pressure tube through which levitating
pods can travel at up to 1,200 km/h –
has been gaining traction and a number
of projects have been proposed all over
the world. However recent develop-
ments suggest the UAE is determined
to be at the forefront of a technology
that could prove to be a game changer
in the transportation sector.
In October Dubai-based global port
operator DP World announced a major
investment in Hyperloop One that will
provide backing for the continued re-
search needed to propel the technology
forward. The move follows a Memoran-
dum of Understanding penned between
by the two companies in August to carry
out feasibility studies for using Hyper-
loop systems in the UAE. Phase 1 has an
initial focus on moving containers from
ships docked at DP World’s flagship Jebel
Ali Port via the Hyperloop system to a
new inland container depot in Dubai.
Last month the Elon Musk-backed
company agreed to carry out a de-
tailed feasibility study in conjunction
with McKinsey & Co. and the Bjarke
Ingels Group (BIG) for Dubai’s Roads
and Transport Authority (RTA). Direc-
tor General & Chairman of the Board
of Executive Directors of the RTA, H.E.
Matter Al Tayer, made it clear that the
deal aims to position the UAE as a pio-
neer of Hyperloop technology.
“This is an opportunity to help trans-
form the UAE from a technology con-
sumer to a technology creator, incubat-
ing expertise for a new global industry, in
line with the UAE’s Vision 2021,” he said.
“With Hyperloop One, we will create a
new means of transportation, keeping
our region at the forefront of transporta-
tion technology and innovation.”
Its exponents says the benefits of
Hyperloop technology include higher
standards of safety than a passenger jet,
lower build and maintenance costs than
high-speed rail, and energy usage, per
person, that is similar to a bicycle.
Rob Lloyd, CEO of Hyperloop One,
says recent developments have advanced
things to the stage where, from a techno-
logical point of view, a Hyperloop sys-
tem could be built in the UAE in the next
five years. “Our agreement with the RTA
is the biggest step yet towards achieving
this goal,” he said at the announcement
of the deal with the RTA.
Engineers, architects and designers from
Hyperloop One and Bjarke Ingels Group
have also collaborated to design an inte-
grated Hyperloop system for the UAE that
includes routes between Abu Dhabi and
Dubai, several Hyperports (the equivalent
of a station or airport) throughout Dubai,
and the conceptual interiors and exteriors
of the individual passenger pods and au-
tonomous vehicles.
The work is based on a detailed study
of how an urban and inter-city transport
network should integrate with the ex-
isting infrastructure. It’s autonomous,
point-to-point and vastly simplifies the
experience of getting from your front
door to your destination.
“By making autonomous vehicles an
integral part of the development of the
Hyperloop One system, we are intro-
ducing the idea of seamless, uninter-
rupted end-to-end mobility,” said Josh
Giegel, Hyperloop One’s President of
Engineering. “Imagine stepping out of
your villa in Dubai, into a self-driving
vehicle that resembles your living
room, and arriving just 48 minutes later
at your office in Riyadh. That is what
Hyperloop One can deliver.”
Page 59
Page 60
nissan-dubai.com
THE ALL-NEW
NISSAN NAVARA PICKUP
PICKUP FOR ALL.
Drive train : 4x4 & 4x2
Transmission : MT & AT
Fuel type : Petrol & Diesel
3 YEARS
/50,000
FREE SERVICE
KMS